BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 29, 2025

Site work for a water / sewer project in Johnstown, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000371626 The current construction cost for Early Construction Pipeline Package 1 is estimated at approximately $7 million. Construction is expected to begin in 2025 for the first Early Construction Pipeline Package Qualification information is being requested from interested contractors to enable the NISP Enterprise to evaluate qualifications of Contractors prior to the submittal of bids on the project(s). Information regarding company experience, references, work history, financial standing, and safety record is requested. NISP plans to construct one or more Early Construction Pipeline Package(s) from 2025 - 2027. The Northern Integrated Supply Project (NISP) will supply 15 Northern Front Range water providers (Participants) with 40,000 acre-feet of new, reliable water supplies annually. Northern Water is pursuing permitting, design and construction of the project on behalf of the Participants. The project components are within Larimer County and Weld County, Colorado and include multiple off-channel reservoirs, canal improvements, relocation of Highway 287, and multiple pipeline packages and pump stations to deliver water to Participants and for exchanges. NISP has acquired the U.S. Army Corps of Engineers (Corps) permitting for a Clean Water Act Section 404 permit to build NISP. A Final Environmental Impact Statement (EIS) was issued by the Corps in July 2018 and a Record of Decision was issued in January 2023. The NISP Delivery System includes large diameter steel pipelines that will be constructed in multiple separate packages, each conveying raw water. The pipelines will generally be AWWA C200 welded steel with polyurethane coating and cement mortar lining. The scope of work for the first Early Construction Pipeline Package 1 consists of the construction of approximately 8,000 feet of 48-inch diameter steel pipe. The pipeline will be constructed in Johnstown and Weld County, CO from south of County Road 50 to County Road 46 along Colorado Boulevard. The Project will also include: 1.Installation of 48-inch welded steel pipe and all associated appurtenances including air and vacuum relief valve assemblies, blowoff assemblies, and a cathodic protection system. 2. Trenchless road and railroad crossings. 3. All site preparation and erosion control, dewatering, traffic control, asphalt road restoration, driveway restoration, revegetation, and restoration of all existing facilities and surface improvements to pre-construction conditions. 4. Surveying and staking, final grading, reclamation, and cleanup. Question Deadline 01/09/2025 at 12:00 PM MT Questions are submitted online Yes Submit all questions about the Project and the Request for Qualifications to the NISP Enterprise via RMEPS electronically The completion goals for this project are as follows: Substantial Completion: April 1, 2026 Final Completion: May 1, 2026 The current construction cost for Early Construction Pipeline Package 1 is estimated at approximately $7 million. Construction is expected to begin in 2025 for the first Early Construction Pipeline Package. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Contractors License Required - Installation Required - Insurance Required Modification: RFQ Page 4, Early Construction Pipeline Package 1 - Bidding and Construction Schedule Schedule Deadline Issue Invitation For Bid March 11, 2025 Pre-Bid Conference (Recommended) March 25, 2025, at 2:00 PM (MST) Question Dues March 28, 2025, at 12:00 PM (MST) Deadline to Issue Addendum April 3, 2025, at 2:00 PM (MST) Solicitations Due April 22, 2025, at 2:00 PM (MST) Board Approval May 8, 2025 Notification to Contractor May 15, 2025

Post-Bid

Water / Sewer

$7,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

168 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
4
Bidding Soon
977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

March 27, 2025

Project location map

Colorado Blvd, Johnstown, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.