Site work for a water / sewer project in Corpus Christi, Texas. Completed plans call for site work for a water / sewer project.

The small-sized project consists of removal and abandonment of existing 2" to 8" (max) waterlines and the installation of new 2" to 8" (max) waterlines. Based on discussions with CCW staff, the small-sized program is typically executed in a more planned, intentional manner mostly in residential rights-of-way and small utility easements. Specific scopes of work are defined in individual Delivery Orders issued under this IDIQ contract. Each Delivery order will provide a specific scope for waterline repair or replacement, identify start and end points of the project and address any Right-of-Way (ROW) needs, access requirements, environmental and stormwater management requirements, traffic control needs, and any other specific items required for the defined scope of work. In general, projects are anticipated to require less than an acre of disturbance and Stormwater Pollution Prevention Plans (SWPPP), Notice of Intent (NOI), and Notice of Termination (NOT) will generally not be necessary. Implementation of sediment and erosion controls will be standard for work under the IDIQ. Proper and regulatory compliant removal and disposal of Asbestos Cement Pipe (ACP) is provided for in the IDIQ contract along with removal and disposal of other waterline materials. New materials installed will be ductile iron, PVC, or fusible PVC pipe along with ductile iron fittings and steel valves meeting the provisions of current City codes, standards, and guidelines. Details will be provided in the individual Delivery Orders.Specific scopes of work are defined in individual Delivery Orders issued under this IDIQ contract. Each Delivery order will provide a specific scope for waterline repair or replacement, identify start and end points of the project and address any Right-of-Way (ROW) needs, access requirements, environmental and stormwater management requirements, traffic control needs, and any other specific items required for the defined scope of work. In general, projects are anticipated to require less than an acre of disturbance and Stormwater Pollution Prevention Plans (SWPPP), Notice of Intent (NOI), and Notice of Termination (NOT) will generally not be necessary. Implementation of sediment and erosion controls will be standard for work under the IDIQ. Proper and regulatory compliant removal and disposal of Asbestos Cement Pipe (ACP) is provided for in the IDIQ contract along with removal and disposal of other waterline materials. New materials installed will be ductile iron, PVC, or fusible PVC pipe along with ductile iron fittings and steel valves meeting the provisions of current City codes, standards, and guidelines. Details will be provided in the individual Delivery Orders. The City intends to award this contract for an initial one-year (12-calendar months) period, with the option to administratively renew for two (2) additional one-year (12-calendar months) periods. March 2025 Anticipated Notice to Proceed) Question Deadline 01/22/2025 at 4:00 PM CT All inquiries or requests regarding this RFB must be submitted in writing online Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered A Bid Bond must guarantee, without qualification or condition, that the Owner will be paid a sum equal to 5 percent (5%) of the greatest amount bid if, within 10 calendar days of Notice of Award of the Contract, the Bidder/Principal: i. fails to enter into a contract for the Project with the Owner; or ii. fails to provide the required Performance and Payment Bonds. February 2025 Projected Date Award of Contract The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%.

Award

Water / Sewer

$4,054,060.00

Public - City

Site Work

48

18

8

7

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
25
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 3, 2025

Project location map

Multiple Locations, Corpus Christi, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.