BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 15, 2025 at 7:00 PM

Updated June 21, 2025

Site work and paving for a mixed-use development in Chiefland, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Levy Road Name: SR 345 Limits: From Cr 345 to Sr 500 Project(s): 21037845201(*) Federal Aid No: D224080B Total Roadway Length: 7.557 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 7.557 Miles Contract Days: 180 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Please read the full advertisement Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, curb & gutters, highway signing, guardrail, bridges, sidewalks/bicycle path and other incidental construction on SR 345 from CR 345 to SR 500 in Levy County. Question Deadline 01/22/2025 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 009 - Resurfacing - SR 345

Award

Roads / Highways

$4,938,588.00

Public - State/Provincial

Paving, Site Work

65

6

8

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
21
Bidding Soon
832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

March 31, 2025

Project location map

FL-345, Chiefland, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.