BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Renovation and addition to a fire / police facility in Chelmsford, Massachusetts. Design plans call for the renovation of a 5,300-square-foot, one-story above grade fire / police facility; and for the addition of a 9,300-square-foot, one-story above grade fire / police facility.

As of September 17, 2025, this project is still in design. Architect firm information has not been determined. Construction is anticipated to begin in spring/summer 2026 *The closed solicitation has been included below for reference: The Town will be providing an Owner’s Project Manager to assist through the design, bidding and construction process. This project is planned to executed as design-bid-build. The Town conducted a feasibility assessment and space needs assessment to provide very preliminary cost estimates and schematic layouts for the renovations of the Fire Stations #3 and #5. Existing information, the space needs assessment, and preliminary layouts conducted as part of the feasibility study are attached to this RFP in Attachment A. Existing drawings of the fire stations are attached to this RFP in Attachment B. Fire Station #3 (260 Old Westford Road) is a single story building constructed in 1970. The existing layout is 2,700 square feet. The existing configuration is lacking adequate space for employee living quarters and limited gear storage space within the apparatus bay. The existing apparatus bay slab is deteriorating. The existing site is 20.65 public space, protected under Article 97, and the footprint of the fire station site is 0.64 acres. The site is located within a Zone II wellhead protection area and adjacent to wetlands. Fire Station #5 (295 Acton Road) is a single story building constructed in 1966. The existing layout is 2,600 square feet. The existing configuration is lacking adequate space for employee living quarters and limited gear storage space within the apparatus bay. The existing apparatus bay slab is deteriorating. The existing site is 0.36 acres.

Design

Fire / Police

$2,600,000.00

Public - City

Addition, Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
589
Active Projects
259
Bidding Soon
4,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

Multiple Locations, Chelmsford, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.