BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Greenwood, South Carolina. Completed plans call for the renovation of a municipal facility.

Courthouse Basement Men's Public Restroom scope of work: o Remove 2 urinals and 1 toilet o Replace 1 urinal and 1 ADA toilet to include Zurn Motion Sense Flush valves o Cap lines not used o Remove existing toilet partitions o Replace with solid plastic partitions o Remove 2 wall hung sinks o Replace with ADA countertops with 2 drop in sinks and Zurn Motion Sense Faucets o Demo floor tile o Replace with new tile o Seal off and tile over existing floor drain o Add furring strips to walls, install, and finish sheetrock o Paint walls o Install drop ceiling o Install LED Lighting Courthouse Basement Women's Public Restroom scope of work: o Remove 2 toilets o Replace 2 ADA toilets to include Zurn Motion Sense Flush valves o Remove existing toilet partitions o Replace with solid plastic partitions o Remove 2 wall hung sinks o Replace with ADA style counter with 2 drop in sinks and Zurn Motion Sense Faucets o Demo floor tile o Replace with new tile o Seal off and tile over existing floor drain o Add furring strips to walls, install, and finish sheetrock o Paint walls o Install drop ceiling o Install LED Lighting Courthouse Basement Public Restroom Corridor scope of work: o Install LED Lighting 8 Courthouse Basement Private Men's Restroom scope of work: o Remove 2 urinals and 1 toilet o Replace 1 urinal and 1 ADA toilet to include Zurn Motion Sense Flush valves o Cap lines not used o Remove existing toilet partitions o Replace with solid plastic partitions o Remove 2 wall hung sinks o Replace with ADA countertops with 2 drop in sinks and Zurn Motion Sense Faucets o Demo floor tile o Replace with new tile o Seal off and tile over existing floor drain o Add furring strips to walls, install, and finish sheetrock o Paint walls o Remove existing acoustical ceiling system o Replace acoustical ceiling system o Remove and reuse LED Lighting Courthouse Basement Private Women's Restroom scope of work: o Remove 2 toilets o Replace 2 ADA toilets to include Zurn Motion Sense Flush valves o Remove existing toilet partitions o Replace with solid plastic partitions o Remove 2 wall hung sinks o Replace with ADA style counter with 2 drop in sinks and Zurn Motion Sense Faucets o Demo floor tile o Replace with new tile o Seal off and tile over existing floor drain o Add furring strips to walls, install, and finish sheetrock o Paint walls o Install drop ceiling o Install LED Lighting Courthouse Basement Private Restroom Corridor scope of work: o Install LED Lighting Project Address-528 Monument St Greenwood, SC 29646. Question Deadline 01/16/2025 at 12:00 PM ET Technical questions to this proposal should be sent by email to Jamey Smith, Facilities Management Director - jmsmith@greenwoodsc.gov. Procurement questions related to this proposal should be sent by email to Anita Baylor, Procurement Officer - abaylor@greenwoodsc.gov. Answers to questions received that would change and/or clarify this Request for Proposal will be provided on the Greenwood County website at electronically. The County reserves the right to accept any or all alternative proposals and award a contract to other than the lowest proposer, to waive any irregularities or informalities or both; to reject any or all proposals; to subdivide the award, and in general to make the award of the contract in any manner deemed by the County, in its sole discretion, to be in the best interest of Greenwood County.

GC Bidding

Municipal

$250,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
58
Bidding Soon
745
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

img_map_placeholder

528 Monument St, Greenwood, SC

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.