BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Site work for a water / sewer project in Loveland, Colorado. Working plans call for site work for a water / sewer project.

Replacements of 12-inch cast iron pipes with 12-inch PVC pipes projected to last 100 years from US 34 to 18th Street. Additional Phase 3 enhancements near the Village Inn Shops included the removal and replacement of storm inlets, relocation of utilities and the installation of new curb, gutter, sidewalk, and driveway access points. Similar work was completed at the south Safeway entrance near Wendy’s, where a storm drain inlet was replaced and the driveway repaved. As of August 25, 2025, this project is expected to be released for bidding by the end of August and will bid to a group of invited general contractors only. There are no architects involved with the project. Construction start date is December 1, 2025.

Pre-Construction/Negotiated

Water / Sewer

$4,160,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
116
Bidding Soon
1,414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.