Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 14, 2025 at 7:00 PM
Updated October 1, 2024
Demolition, site work, paving and new construction of a mixed-use development in Whitman, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 138,605-square-foot, three-story above grade educational facility; for site work for a educational facility; playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Project Description: New construction project will be completed in 2 main phases, construction of the new building in phase 1 and demolition and site work in phase 2. The new Whitman Middle School will be located adjacent to the existing school in the current field. The new school will be 138,605 GSF and will hold 675 students grades 5 through 8. Demolition of the old school and sitework will follow once students and faculty have moved into the new school. The Whitman Middle School consists of classrooms, offices, science labs, gymnasium, cafeteria, auditorium, media center, art and music rooms, and technology rooms. The new school consists of one 3-story building. The project also includes a new parking lot, landscaping, utilities, play fields and playground area. Please note all Filed-subcontractor bidders, except elevators, and all General Contractor bidders must be prequalified to bid. Proposers shall examine all information and materials contained in and with this solicitation. Failure to do so shall be at the proposer's risk. The Whitman Hanson Regional School District reserves the right to waive any informalities or irregularities in the proposals received, or to reject any and all proposals, wholly or in part. The new building will be located on the portion of the site, currently used as open playfield, behind the existing middle school building. The construction delivery method will be Design-Bid-Build. The construction of the new Whitman Middle School will occur in phases as described and defined in the construction documents. The new Whitman Middle School building will be constructed in its entirety prior to demolition of the existing middle school. Students and staff will continue to occupy the existing throughout construction of the new middle school. When the existing middle school is no longer needed, it will be abated of all hazardous materials and demolished. Sitework within and surrounding the area occupied by the existing building will then be completed. Exterior sitework for the project will include the completion of related site improvements, playfields, playgrounds, underground utilities, parking and on-site service and access roadways. The scope of sitework includes ground improvements, erosion control, roadways, pedestrian sidewalks, drainage improvements, retaining walls, earthwork, utility services, landscaping, site amenities, and fencing.
Bid Results
Educational
$91,076,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2025
April 14, 2025
100 Corthell Ave, Whitman, MA
Related To This Project
Whitman, MA
Bid Date: Jan 29 2025
Whitman, MA
Bid Date: Nov 21 2024
Whitman, MA
Bid Date: Oct 30 2024
Whitman, MA
Bid Date: Oct 02 2024
Whitman, MA
Bid Date: Oct 02 2024
Whitman, MA
Bid Date: Nov 12 2021
Whitman, MA
Bid Date: Apr 16 2019
Whitman, MA
Bid Date: May 05 2021
Whitman, MA
Bid Date: Aug 08 2024
Whitman, MA
Bid Date: Aug 08 2024
Whitman, MA
Bid Date: Mar 14 2024
Whitman, MA
Bid Date: Mar 05 2024
Whitman, MA
Bid Date: Oct 13 2023
Whitman, MA
Bid Date: Dec 19 2018
Whitman, MA
Bid Date: Mar 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.