BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Farmington Hills, Michigan. Completed plans call for the renovation of a educational facility.

Farmington Public Schools Structured Cabling Project team Indicate the level of qualification of the staff who will be assigned to this project. Qualification will be based on certifications and years of experience with the materials proposal in similar configurations. Also, describe the implementation team and their roles in ensuring a successful cutover. Names of staff need not be provided; however, the response in this section will indicate the minimum level of experience that will be provided. If necessary, please include additional categories to address additional levels of staff or staff with different certifications and years of experience. Comply/Exception Form Failure to disclose additional components and estimated costs that are required to deliver the described functionality but not included as a part of your proposal will be grounds for disqualification of your proposal, or the vendor will be responsible for providing the missing components at no additional cost to the District. BID BONDS Every bid shall be accompanied by either a cashier's check on a solvent bank or by a bond executed by a surety company authorized to do business in the state of Michigan. A 5% bid bond or cashier's check shall be required. Such check or bond shall name the District as the recipient. The amount of such bid bond or cashier's check shall be forfeited as liquidated damages, costs, and expenses incurred by the District if the vendor, after given an award as a successful vendor, shall fail within 30 days after the notice of such award to enter into an appropriate contract with the District. This RFP outlines the performance, operational, and administrative requirements the District is seeking. Detailed specifications for this project are included in Section 2 of the RFP. In accordance with the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012, all vendors must execute the Iran Linked Business Affidavit and include it in their proposals (see Appendix A). Said forms are included in the Vendor Response Forms. The District will not accept a proposal that does not include this sworn and notarized disclosure statement. The form must accompany your bid proposal (see Appendix A). Deadline for submittals of questions related to this RFP December 10th, 2024 End of Day there is a potential opportunity to begin work during the school year, after hours. See detailed schedule in section 2. Bid date notes "Farmington Public Schools Structured Cabling RFP" on the package. The wording "ORIGINAL" is to appear on the outside of the binder containing the original signed proposal. If a bid bond or cashier's check is used, an original copy of the bid bond must be submitted in the binder marked Original. Proposals may not be delivered via facsimile or email. All proposals MUST include the Vendor Response Forms provided in Appendix A. The District reserves the right to reject any or all proposals in their entirety, evaluate suggestions or exceptions, waive irregularities, or select certain equipment from various vendor proposals, based on the best interests of the District. The District reserves the right to reject any or all proposals for a specific section. The District reserves the right to award specific buildings to one or more vendors. The District reserves the right to request any additional information that might be deemed necessary after the completion of this document.

GC Bidding

Educational

$70,000.00

Public - City

Renovation

30

5

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
107
Bidding Soon
1,292
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

img_map_placeholder

Multiple Locations, Farmington Hills, MI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.