EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Tinley Park, Illinois. Completed plans call for site work for a water / sewer project.

Site Address: 17801 Cloverview Drive City: Tinley Park County: Cook State/Province: IL Site Directions: Project is located at the Village's Post 11 High Tank off of Cloverview Drive. Description: This project generally consists of: - Full blast of the existing interior wet coating system. - Application of new interior wet coating system. - Spot tool cleaning and application of new interior dry coating system where existing substrate has failed. - Full blast of exterior coating system. - Application of new exterior coating system. - Miscellaneous mechanical and electrical repairs. - Interior wet roof repairs and miscellaneous welding. Tank Coating System 1. Dry Interior: Spot abrasive blast clean in accordance with SSPC-SP-6 Standards and then prime and paint corroded areas. Other components such as the existing Riser piping and pit piping are to be abrasive blast cleaned in accordance with SSPC-SP-10 Standards then primed and painted. Then install new insulation with an aluminum frost jacket. 2. Exterior Coating: The exterior of the tank will need to be full abrasive blast cleaned to near white finish in accordance with SSPC-SP-5 Standards, then primed and painted with a three-part polyurethane / fluoropolymer polyurethane coating system. 3. Interior Wet: The interior shall be full abrasive blast clean to near white finish in accordance with SSPC-SP-10 Standards, remove spent media and apply new three coat NSF approved, immersible rated epoxy paint coating system. Welding Interior Wet 4. Various locations of metal fatigue shall be seal welded, pit welded and painted. 5. Install mud valve to overflow drain. Interior Dry 6. Various locations of metal fatigue shall be seal welded, pit welded and painted. Exterior 7. Remove and replace roof access hatch with an aluminum style lid. The new lid should include a locking hasp and chain. 8. Install a climb assist ladder up device on the exterior (roof side) of the drywell tube. 9. Remove the existing vent in its entirety and install an aluminum pressure pallet style vent. 10. Install a new aluminum wet access manway in the roof above the new wet ladder. 11. Remove the antenna mount on the roof in its entirety. Install a new 30'-0" pipe style handrail conforming to OSHA regulations. 12. Install three ventilation manways on the roof located outside the new handrail. 13. Install a double LED aviation light on the new handrail. 14. Modify the overflow pipe to discharge at a downward angle onto the splash pad. Interior Dry Piping 15. Remove and replace existing expansion joints. 16. Clean and blast existing riser piping. 17. Reinsulate fill pipe, riser pipe and valve vault piping. Hatches and Manways 18. Install new 30" access manway to wet interior. 19. Replace the 24" diameter roof access hatch and the interior wet access hatch with new 30" diameter roof hatches. 20. Install a lock and hasp on the proposed dry riser and wet interior hatch to deter unauthorized personnel from accessing water system. 21. Install new gaskets on the interior dry and wet access manways. Vent 22. Replace existing roof vent with new aluminum vent and install HDPE screen. Antennas 23. The existing antenna mount will remain in use during the new coating system application. Electrical 24. Replace interior lighting with new LED lighting along ladder in each platform area. 25. Replace conduit, wiring and the FAA Fresnel fixture with new energy efficient LED lighting unit to match existing. 26. Install new cover plates on missing existing junction boxes and LB fittings throughout interior. Ladders 27. Dry: The interior dry ladder is in good condition. Install new cable guided type fall protection device on the interior dry access tube ladder and new ladder up device at top of ladder near roof. 28. Wet: Replace interior wet ladder in its entirety. Cathodic Protection System 29. Remove existing cathodic protection system and replace the existing rectifier and hanging anode system with output cable and conduit to SCADA panel. Altitude Valve Vault and Expansion Joint Piping 30. Provide new altitude valve and expansion joint with pipe supports under all existing interior piping and valves. Water Stratification (Fresh Mix System) 31. Provide new Medora mixing system. A Gridbee Mixing System along with all mechanical and electrical. Concrete Repairs 32. Contractor to repair the spalling concrete on the exterior of the tank along the top of the foundation. B. Debris Removal. Included as part of the above Work shall be the removal of Cathodic Protection System and any and all debris resulting from the Work. Such debris shall be legally and properly disposed off site. All fees for such disposal shall be the responsibility of the Contractor. C. Painting. Paint shall be that of nationally recognized manufacturer and suitable for the application. See Section 09 91 13. 1.02 LOCATION OF THE WORK The project work site is located at 17801 Cloverview Drive, Tinley Park, IL.

Award

Water / Sewer

$1,357,883.00

Public - City

Site Work

17

17

23

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Warranties
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
191
Bidding Soon
2,159
All Active Projects
1,076
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

img_map_placeholder

17801 Cloverview Dr, Tinley Park, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehabilitation of the 1,000,000 Gallon Hydropillar High Tank

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.