Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Alton, Illinois. Contact the soliciting agency for additional information.
City/County Alton 1. Bituminous Patching Material (Pre-Mix): EZ Street or UPM, conforming to State of Illinois Specification M120-16 - Furnished and Delivered - Alton Public Works Department - 200 Ton 2. Bituminous Patching Material (Cold Mix), conforming to State of Illinois Specification M19-07 or M19-07 Modified - Furnished Only - Loaded in City Trucks at Bidder's Plant - 200 Ton 3. Hot-Mix Asphalt Surface Course, Mix C, N70; - Furnished Only - Loaded in City Trucks at Bidder's Plant - 1,000 Ton 4(a). Bituminous Material:HFE-150, Liquid Asphalt - Furnished Only - Loaded in City Trucks at Bidder's Plant - 35 Ton 4(b). Bituminous Material (Prime Coat): SS-1h - Furnished Only - Loaded in City Trucks at Bidder's Plant - 15 Ton 4(c). Bituminous Material (Prime Coat): NTEA - Furnished Only - Loaded in City Trucks at Bidder's Plant - 15 Ton 4(d). Bituminous Material (Prime Coat): SS1vh - Furnished Only - Loaded in City Trucks at Bidder's Plant - 15 Ton 5(a). Furnishing Class SI/PV Concrete, 6.0 Bag Mix - Furnished and Delivered - City Streets - 200 C.Y. 5(b). Furnishing Class SI/PV Concrete, 6.5 Bag Mix - Furnished and Delivered - City Streets - 200 C.Y. 5(c). Furnishing Class PP-1 Concrete, 7.0 Bag Mix - Furnished and Delivered - City Streets - 50 C.Y. 5(d). Furnishing Class PP-2 Concrete, 7.8 Bag Mix - Furnished and Delivered - City Streets - 50 C.Y. 5(e). Controlled Low Strength Material (CLSM) - Furnished and Delivered - 100 C.Y. 5(f). Load Charge (less than 4 CY) - City Streets - 50 Each 6(a). Stone Riprap, RR3 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 175 Ton 6(b). Stone Riprap, RR4 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 175 Ton 6(c). Fine Aggregate: Sand, FA 1 - Loaded in City Trucks at Bidder's Plant - 100 Ton 6(d). Coarse Aggregate: Crushed Stone, CA02 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 200 Ton 6(e). Coarse Aggregate: Crushed Stone, CA03 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 200 Ton 6(f). Coarse Aggregate: Crushed Stone, CA06 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 1500 Ton 6(g). Coarse Aggregate: Crushed Stone, CA07 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 300 Ton 6(h). Coarse Aggregate: Crushed Stone, CM16 - Furnished Only - Loaded in City Trucks at Bidder's Plant - 350 Ton Project Location: Various Streets in Alton ILDOT - Bituminous Patching Material
Sub-Bidding
Roads / Highways
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
February 13, 2025
Multiple Locations, Alton, IL
Related To This Project
Alton, IL
Bid Date: Jun 24 2020
Alton, IL
Bid Date: Jun 24 2020
Alton, IL
Bid Date: Dec 12 2024
Alton, IL
Bid Date: Nov 25 2024
Alton, IL
Bid Date: Nov 08 2024
Alton, IL
Bid Date: Sep 04 2024
Alton, IL
Bid Date: Aug 22 2024
Alton, IL
Bid Date: Sep 17 2024
Alton, IL
Bid Date: Jul 24 2024
Alton, IL
Bid Date: Jul 12 2024
Alton, IL
Bid Date: Jul 02 2024
Alton, IL
Bid Date: May 31 2024
Alton, IL
Bid Date: Jun 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.