Site work and paving for a road / highway in Calhoun, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Mclean County Fd04 075 0056 006-007 : Bethel Grove - Bethel Church Road(KY-56) Midpoint, a Distance of 0.12 Miles. Widening. Syp No. 02-08852.00. The Department Will Only Accept Bidder Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. KYDOT - Call 319 - Widening - Bethel Grove - Bethel Church Road(KY-56) This specification covers the requirements and practices for applying a non-tracking tack asphalt coating. Place this material on the existing pavement course, prior to placement of a new asphalt pavement layer. Use when expedited paving is necessary or when asphalt tracking would negatively impact the surrounding area. This material is not suitable for other uses. Ensure material can "break" within 15 minutes under conditions listed in 3.2. Minimum administrative and supervisory requirements necessary for coordination of work on the project include but are not necessarily limited to the following: Coordination and meetings. Limitations for use of site. Coordination of crafts, trades and subcontractors. General installation provisions. Cleaning and protection. Conservation and salvage. General: Thissection specifies procedural and administrative requirements for compliance with governing regulations and codes and standards imposed upon the Work. These requirements include obtaining permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards. 1. The term, "Regulations", is defined to include laws, statutes, ordinances and lawful orders issued by governing authorities, as well as those rules, conventions and agreements within the construction industry which effectively control the performance of the work regardless of whether they are lawfully imposed by governing authority or not. A. The Contractor shall furnish all necessary labor, machinery, tools, apparatus, equipment, materials, service and other necessary supplies and perform all Water Utility Work shown on the Drawings and/or described in the Specifications and Contract Documents at the unit prices as indicated by the Bidder in the Bid. B. The Bidder declares that he has examined the site of the Work and informed himself fully in regard to all conditions pertaining to the place where the Work is to be done; that he has examined the Drawings, Specification and Contract Documents for the Work, and has read all special provisions furnished prior to the opening of bids; and that he has further satisfied himself relative to the Work to be performed. The Bidder further declares that he understands that unit quantities for Water Utilities are approximately only, are subject to increase or decrease, and that, should the quantities of any of the items be decreased, the Bidder will make no claim for the anticipated profits. In addition, the Owner also reserves the right to adjust quantities, either by addition or deletion and as -BID unit price shall remain in effect for these quantity adjustments. C. The Bidder declares that he understands the Utility Work must be coordinated with the overall Work shown on the KDOH Drawings on the project and that all General Conditions, etc., shall apply, including any AIS requirements. General This section specifies procedural requirements for non -administrative submittals including shop drawings, product data, samples (when samples are specifically requested) and other miscellaneous work -related submittals. Shop drawings, product data, samples and other work -related submittals are required to amplify, expand and coordinate the information contained in the Contract Documents. All submittals shall be submitted in electronic format through the Engineer's submittal process and shall be checked and reviewed by the Contractor before submission to the Engineer. The review of the submittals by the Engineer shall not be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory. Review of such submittals will not relieve the Contractor of the responsibility for any errors, which may exist, as the Contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory construction of all work. General: Required inspection and testing services are intended to assist in the determination of probable compliance of the work with requirements specified or indicated. These required services do not relieve the Contractor of responsibility for compliance with these requirements or for compliance with requirements of the contract documents. Tests, inspections and certifications of materials, equipment, subcontractors or completed work, as required by the various sections of the Specifications shall be obtained by the Contractor and all costs shall be included in the contract price. The Contractor shall submit to the Engineer the name of any testing laboratory to be used. Contractor shall deliver written notice to the Engineer at least 24 -hours in advance of any inspections or tests to be made at the project site. All inspections or tests to be conducted at the field shall be done in the presence of the Engineer or his representative. Certifications by independent testing laboratories may be by copy of the attest and shall give scientific procedures and results of tests. Certifications by persons having interest in the matter shall be by original attest properly sworn to and notarized. Inspections, tests and related actions specified in this section and elsewhere in the contract documents are not intended to limit the Contractor's own quality control procedures which facilitate overall compliance with requirements of the contract documents. A. Related requirements specified elsewhere: 1. Project Closeout: Section 01700. 2. Cleaning for Specific Products or Work: Specification section for that work. B. Maintain premises free from accumulations of waste, debris, and rubbish, caused by operations. C. At completion of work, remove waste materials, rubbish, tools, equipment, machinery and surplus materials, and clean all sight -exposed surfaces; leave project area clean and ready for use. Provide all labor, materials, equipment, and services required for seeding of all disturbed areas caused by construction activities and for installation of sod where indicated on the Contract Drawings or specified herein. Furnish, install, operate, and maintain variable message signs at the locations shown on the plans or designated by the Engineer. Remove and retain possession of variable message signs when they are no longer needed on the project. This specification covers the requirements and practices for applying an asphalt adhesive material to the longitudinal joint of the surface course of an asphalt pavement. Apply the adhesive to the face of longitudinal joint between driving lanes for the first lane paved. Then, place and compact the adjacent lane against the treated face to produce a strong, durable, waterproof longitudinal joint.

GC Bidding

Roads / Highways

$700,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
17
Bidding Soon
368
All Active Projects
168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

img_map_placeholder

KY-56, Calhoun, KY

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.