EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2025 at 7:00 PM

Updated October 1, 2024

Demolition and site work for a residential development in Newton, New Jersey. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Reference Number 0000371634 Question Acceptance Deadline 01/16/2025 02:00 PM EST Questions are submitted online Yes online bid opening -- --- One tap mobile +13092053325,,81139203808#,,,,*446289# US +13126266799,,81139203808#,,,,*446289# US (Chicago) --- Dial by your location o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 558 8656 US (New York) o +1 646 931 3860 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 669 900 9128 US (San Jose) o +1 689 278 1000 US o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 669 444 9171 US Meeting ID: 811 3920 3808 Passcode: 446289 Zoom opening information contact the Qualified Purchasing Agent at: Sean P. Canning, QPA scanning@TheCanningGroup.org a. Demolition of Structure, including cutting and capping all utilities, removal of all site improvements, and final restoration. In addition, the vendor shall also be required to have the existing water and sewer service lateral lines disconnected at the watermain and sewer main. b. Proper asbestos remediation and removal in accordance with all Federal, State and/or local rules and regulations, including but not limited to USEPA 40 CFR 61, subpart M. c. Construction permits are required. The Construction permits will be provided by the Town of Newton Building Department Construction Official. d. The contractor shall be responsible for notifying the Construction Official of the addresses of structures to be demolished. e. Temporary safety fences shall be 6-foot chain link fencing with silt screening. Chain link fence shall be located along front and side property lines and one foot off of the rear property line. f. Contractors shall be responsible to notify and obtain written release of all utilities having service connections within the structure such as water, electric, gas, sewer, cable TV, and other connections. The approval to demolish any structure will not be given until such release is submitted and approved by the Town's Construction Department. The written release shall state that the respective service connections and appurtenant equipment, such as meters and regulators, have been removed and sealed, or plugged in a safe manner. Contractor is responsible to obtain and pay for any and all associated costs including, application fees, permits and bonds that are necessary to obtain written release from the various utility companies g. Contractors shall be responsible for the proper collection and disposal of asbestos either in the building materials (i.e., siding, insulation, etc.) or where it is used to protect pipes carrying hot water for heating. 1. The Construction Official shall be responsible for the required paperwork. The Contractor shall be responsible to verify existing conditions and the written verification of the required disposal. h. Notice to adjoining property owners shall be done by the awarded contractor. i. The contractor shall be responsible for informing the Construction Official two (2) weeks prior to the approximate date of demolition. j. Contractors shall be required during the demolition of a structure, that the premises shall be maintained free from all unsafe or hazardous conditions. This includes the restoration of established grades and the erection of temporary safety fences. k. Contractors shall be responsible to have all structures that have been left vacant for more than twenty-one (21) days to be baited for rodents by a licensed pesticide company. 1. Contractors to supply written verification to the Construction Official. l. The contractor shall be responsible for having any existing private well capped by a New Jersey licensed well driller as per N.J. regulations and written verification supplied to the Construction Official. m. Contractors shall be responsible for the location and proper closure of any existing drywells, cisterns, shallow wells i.e., points, cesspools or any subsurface disposal system for either sewage or laundry waste and also any drainage collection system on site for storm water. n. The contractor shall be responsible for the proper disposal of small amounts of household chemicals, consumer packaged pesticides, oils, paints, or other related items.

Bid Results

Residential Subdivision

$27,500.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Refrigerant Piping, Refrigerants
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
273
Bidding Soon
4,726
All Active Projects
2,154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 24, 2025

img_map_placeholder

20 Union Pl, Newton, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Demolition of Structure

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.