BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Valparaiso, Indiana. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; and for the demolition of a bridge / tunnel.

Local Public Agency: Porter County Government Project Location: Division Road over Hutton Ditch in Porter County Project Description: Replacements of Bridge 1 carrying Division Road over Hutton Ditch Phases Included: CE Estimated Construction Amount: $2,049,375.00 Funding: 80% Federal; 20% Local Term of Contract: Until Contract Completion DBE goal: 5% INDOT - RFP Engineering - Replacements of Bridge 1

Conceptual

Bridges / Tunnels

$2,049,375.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
717
Active Projects
436
Bidding Soon
3,541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

Project location map

Division Rd, Valparaiso, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.