BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2025 at 7:00 PM

Updated January 23, 2025

Site work for a water / sewer project in Bozeman, Montana. Conceptual plans call for site work for a water / sewer project.

This project will either replace and upsize, or parallel certain portions of the sanitary sewer along the 11,500 feet length of the existing North Frontage Road Interceptor. The North Frontage Road Interceptor supports large portions of the City's southeast and eastern sewersheds. The extents of the project is generally located between Springhill Road and Bridger Drive. Portions of the interceptor have been shown to have an increased risk of failure due to the age and condition of the asset while other segments have been identified in the City's hydraulic model to be near hydraulic capcaity during wet weather modeling scenarios. The project consists of two main components: first, the replacement of existing parallel trunk sewer, which includes the replacement and upsizing of the worst condition parallel interceptor main; second, the installation of a new parallel interceptor main along portions of the existing interceptor that currently only have a single segment of main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future buildout conditions while decreasing overall risk along the interceptor corridor. Lastly, the existing interceptor main that is not mitigated as part of the project will be inspected for current condition and either replaced or rehabilitated at a later date, thus utilizing the City's existing assets to their full expected life-cycle extent. The project will conform to the City's Wastewater Collection Facility Master plan. Engineering is scheduled in FY27 and construction in FY29. This project is included in the city's fy 2025-2029 Capital Improvement Program. As of January 22, 2025, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$7,817,300.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
16
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.