BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work and paving for a mixed-use development in Royal Oak, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000371982 2025 Concrete Pavement Replacement & Pre-paid Sidewalk Improvements The work shall consist of furnishing all labor, materials, equipment, and incidental items for the following major items of work: Remove & Replace 4"-8" Concrete Walk/Approach (750 SY+/-) Remove & Replace 6"-10" Concrete and Composite Pavement (4650 SY+/-) Remove & Replace Curb & Gutter (400 LF+/-) HMA Patching (175 TON+/-) The city will not consider bids that do not comply with Royal Oak Ordinance 2022-07, Responsible Contractor Ordinance. Question Deadline 01/16/2025 at 12:00 PM ET Questions are submitted online No Each proposal must be accompanied by a certified check or bid bond by a recognized surety company in the amount of five percent (5%) of the bid, payable to the City of Royal Oak as security for the acceptance of the contract. No bidder may withdraw his proposal between the date set for the opening thereof and the date upon which the contract is awarded. The City reserves the right to reject any or all proposals and the right to waive defects in proposals.

Award

Roads / Highways

$684,662.00

Public - City

Paving, Site Work

3

3

8

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
160
Bidding Soon
2,573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

May 5, 2025

Project location map

Multiple Locations, Royal Oak, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.