BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated April 18, 2025

Renovation of a residential development in Lakewood, Colorado. Completed plans call for the renovation of a residential development.

Reference Number 0000372267 Question Deadline 02/05/2025 at 5:00 PM MT DESCRIPTION OF PROJECT: The scope of work is to provide a new 600A, 208/120V, 3-phase electrical service to the existing building at 870 Parfet Street. In addition, a new 125KVA/156KVA, 208/120V, 3-phase diesel generator will also be installed in conjunction with an ATS and MTS. All new electrical equipment will be installed on the exterior of the building. A new concrete pad for the generator and housekeeping pads for the electrical equipment will be required to be installed. New underground service laterals will be installed from the existing Xcel Energy transformer to the new electrical service equipment. Coordination with Xcel Energy is required and to be completed by the electrical contractor. The new electrical service will re-feed the existing electrical equipment located on the inside of the building. A new panelboard will be installed inside of the building. New receptacles will be connected to an existing panelboard to feed new owner furnished equipment. Electrical contractor shall remove existing electrical service equipment in addition to existing electrical service equipment that is no longer in use. Electrical contractor is required to maintain power to the existing building via a roll-up generator during service replacement and cut-over times as the existing facility must remain operational with power. The project is to be completed within ninety (90) calendar days from the date of the Notice to Proceed, If contractors schedule exceeds 90 calendar days please list the required amount of time on bid schedule in section 004100 Bid Form. Contractor will be issued a Notice to Proceed for procuring materials prior to the start of Construction (May 1, 2025). This will not count towards calendar days. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - Insurance Required Award Requirements - All or None Award A Bid Guaranty in the amount of five percent (5%) of the total Bid must accompany each Bid in accordance with SECTION 00 21 13 INSTRUCTIONS TO BIDDERS - 1.06 BID GUARANTY. An original Bid Guaranty with accompanying Power of Attorney must be provided to the City of Lakewood Finance Operations Division, 480 S. Allison Pkwy., Lakewood, CO 80226, within forty-eight (48) hours of the date of the City's Notice of Intent to Award. Bid Guaranty must be received prior to any Bid award. The City may hold Bids for a period not to exceed sixty (60) days from the date of the opening of the Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders prior to awarding a Contract. However, the City reserves the right to reject any or all Bids and to waive any irregularities or informalities, not required by law, in the bidding process or in any Bids, as may be deemed by the City to be in its best interest.

Award

Residential Subdivision

$356,273.00

Public - City

Renovation

10

10

4

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
7
Bidding Soon
1,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

April 1, 2025

Project location map

870 Parfet St, Lakewood, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.