BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work and paving for a sidewalk / parking lot in Omaha, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The District, with offices at 8901 S. 154th St. Omaha, NE is requesting sealed bids for trail construction near John A Creighton Blvd and Bedford Ave in Douglas County, Nebraska. For more information contact Eric Williams at the District, (402) 444-6222 or EWilliams@PapioNRD.org. Work covered under this section shall consist of the fine grading of the site to conform to the grades, lines and contours shown on the Drawings. The Work shall include all excavation, shaping and sloping of all cut areas; all placing, compacting, shaping and finishing of all embankments in fill areas necessary for the completion of all site and roadway re-grading; including sub-grades, shoulder slopes and sidewalk subgrades. Work under this section shall consist of the preparation and placement of exterior portland cement concrete for all concrete site improvements including, but not limited to concrete walk pavement, concrete trail pavement; roadways, parking lots, curbing, combination curb and gutter, basketball court concrete pavement, handicapped curb ramps, concrete pavement under playground surfacing, concrete shelter pavement, heavy duty concrete pavement on the prepared subgrade, etc. where located and as detailed on the plans. The work included in this item shall consist of providing an accepted uniform stand of perennial turf grasses by fine grading and furnishing and placing fertilizer, seed, and mulch on all areas indicated on the plans as hydroseeded areas. This shall include, but not be limited to: disking, harrowing, leveling/fine grading, planting, fertilizing, mulching, establishment, maintenance till acceptance, etc. The Scope of Work for Omaha Beltline Trail - Phase 04 (OPW 54816),includes construction of a 10' wide multi-use trail, sidewalk, retaining wall, storm sewer system, concrete street pavement, and associated landscaping.

Award

Sidewalks / Parking Lot

$486,361.00

Public - State/Provincial

Paving, Site Work

10

14

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
962
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

June 1, 2025

Project location map

John A Creighton Blvd & Bedford Ave, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.