Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 7, 2025 at 8:00 PM
Updated August 8, 2025
Site work and paving for a road / highway in Clayton, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Nc 50 to Us 70 Business. Widen to Multi-lanes County : Johnston Route - Nc 42 Length(Miles) - 8.64 Sti Category Funded : Region A As of August 7 , 2025, the project is in Conceptual status. Anticipated letting year is 2029. NCDOT - Widen to Multi-Lanes - NC 42 *project Information Has Been Obtained Through a Public State Transportation Improvement Plan (Stip). A Stip is a Financial Schedule for Short- and Long-range Projects Which is Updated Regularly. Information Listed in the Stip Often Evolves Based on Funding Availability. The Project Details, Including Timeline and Value, Are Subject to Change. The Content Management Team Will Continue to Pursue Additional Details as They Become Available. https://www.bizjournals.com/triangle/news/2025/01/31/johnston-county-economy-development-jobs-nvo.html ______________________________________________________________________________________________________________________________________________ As Johnston County's population races toward a quarter million, addressing aging infrastructure and rising demand is a top priority. One project leaders said they'd like to see a quicker timeline for is the widening of N.C. Highway 42, which stretches across the northern part of the county and through Clayton. Construction is slated to begin on the $156.9 million project, which will make a portion of the highway a four-lane road divided by a median, in 2029. In general, there needs to be more collaboration in order to quicken the pace of development, according to Ed Aldridge, chairman of the Johnston County Economic Development Advisory Board and vice president of business development for RiverWild. "In today's market, time is money," Aldridge said. "So there's got to be more collaboration between developers, industries and all that with the towns and counties. When you're talking about a development that not long ago would take you 24 months to carry through the process, versus if it is now taking the 48 to 60 months to carry through the process, all of those costs associated with that end up getting rolled into the final product." "We just have to figure out how to move these things down the pipeline a little bit quicker," he said. "Covid threw everyone through a loop. We're kind of on the backside of that. So I think we need to stop making excuses and say, where are the answers ______________________________________________________________________________________________________________________________________________ Nc 50 to Us 70 Business. Widen to Multi-lanes County : Johnston Route - Nc 42 Length(Miles) - 8.64 Mode - Highway As of January 09, 2025, the Project is in Conceptual Status. Anticipated Letting Year is 2029. NCDOT - Widen to Multi-Lanes - NC 42 *project Information Has Been Obtained Through a Public State Transportation Improvement Plan (Stip). A Stip is a Financial Schedule for Short- and Long-range Projects Which is Updated Regularly. Information Listed in the Stip Often Evolves Based on Funding Availability. The Project Details, Including Timeline and Value, Are Subject to Change. The Content Management Team Will Continue to Pursue Additional Details as They Become Available.
Conceptual
Roads / Highways
$74,200,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2029
NC-42, Clayton, NC
Related To This Project
Clayton, NC
--
Clayton, NC
Bid Date: Apr 15 2025
Clayton, NC
Bid Date: May 13 2025
Clayton, NC
Bid Date: May 01 2025
Clayton, NC
Bid Date: Jul 08 2025
Clayton, NC
Bid Date: Jul 21 2025
Clayton, NC
Bid Date: Jul 24 2025
Clayton, NC
--
Clayton, NC
--
Clayton, NC
--
Clayton, NC
Bid Date: Apr 29 2025
Clayton, NC
Bid Date: Apr 22 2025
Clayton, NC
Bid Date: Apr 17 2025
Clayton, NC
Bid Date: Mar 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
