Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 14, 2025 at 7:00 PM
Updated August 24, 2026
Site work for a water / sewer project in Central, South Carolina. Completed plans call for site work for a water / sewer project.
18-mile Creek Middle WWTP Step Screen Replacement Bar Screen Replacement at the 18-Mile Creek Middle WWTP The Project Includes the Demolition, Removal and Proper Disposal of the Existing Mechanical Bar Screen and the Installation and Start Up of a New Step Screen Provided by Others in the Same Location as the Existing Bar Screen. All Materials, Labor, and Modifications Required to Install the New Step Screen as Per the Manufacturers Recommendations for a Fully Functional Unit Are the Responsibility of the Contractor. The Work includes the demolition, removal, and proper disposal of the existing mechanical bar screen. The Work also includes the installation and start-up of a new step screen provided by others in the same location as the existing bar screen. All materials, appurtenances, labor, and modifications required to install the new step screen as per the manufacturer's recommendations for a fully functional unit are the responsibility of the Contractor. Project Location: 467 WILLA WONKA DRIVE CENTRAL SC 29630 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction Cost Range: $40,000 - $60,000 The Project has an expected duration of twenty-one (21) days. Question Deadline 02/04/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact Steven R. Gandy, Ph.D., P.E 4105 Faber Place Drive, Suite 410 Charleston, SC 29405 Email Address: sgandy@wkdickson.com
Post-Bid
Water / Sewer
$60,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2025
March 14, 2025
467 Willy Wonka Dr, Central, SC
Related To This Project
Central, SC
--
Central, SC
--
Central, SC
--
Central, SC
Bid Date: Apr 10 2025
Central, SC
Bid Date: Apr 22 2025
Central, SC
Bid Date: May 29 2025
Central, SC
Bid Date: Jun 26 2025
Central, SC
Bid Date: Jun 26 2025
Central, SC
Bid Date: Oct 17 2024
Central, SC
Bid Date: Aug 15 2024
Central, SC
Bid Date: May 02 2019
Central, SC
Bid Date: Jul 26 2024
Central, SC
Bid Date: Dec 08 2021
Central, SC
Bid Date: Jul 05 2024
Central, SC
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed