EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2025 at 7:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Lancaster, Virginia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a playground / park / athletic field; and playground / park / athletic field.

Westland Beach at Windmill Point Park Improvements The Westland Beach at Windmill Point Park Improvements project is being developed by Lancaster County and generally consists of approximately 2.3 acres of access, infrastructure, landscaping and building improvements for a 65-space parking lot, a public restroom facility and connections to the beach and fishing pier that are currently under construction. This construction phase shall be in accordance with the December 16, 2024 Westland Beach at Windmill Point Site Improvements Plan prepared by Bay Design Group and the December 16, 2024 Westland Beach at Windmill Point Park Comfort Station plans prepared by Guernsey Tingle. Bids shall be on the basis indicated in the Bid Form. Bids shall not be submitted by facsimile or email. Lancaster County is an equal opportunity employer Inquiries and clarifications regarding the project and Bid Form shall be directed to the Project Manager, W. Ben Burton, PE (bburton@baydesigngroup.com) c/o Bay Design Group, 40 Cross Street, Urbanna, VA 23175; 804-693-2993.. Question Deadline 02/04/2025 All questions about the meaning or intent of the Plans or Bid Documents shall be submitted to the Engineer (W. Ben Burton, PE c/o Bay Design Group, 40 Cross Street, Urbanna VA, 23175; 804-693-2933, bburton@baydesigngroup.com) in writing

Post-Bid

Sidewalks / Parking Lot

$3,000,000.00

Public - County

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
65
Bidding Soon
1,184
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 7, 2025

img_map_placeholder

To Be Determined, Lancaster, VA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Windmill Point-Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.