EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Olney, Illinois. Completed plans call for site work for a water / sewer project.

**As of Arpil 7th, 2025, the project was awarded to MB Construction but the awarded amount is not available.** Richland County (Owner) is requesting Bids for the construction of the following Project: EJ Water Cooperative, Inc. Phase 82 Water Main Improvements, Olney, Claremont & Bonpas Townships, Richland County. The Project includes the following Work: Construction of approximately 29,030 lineal feet of 4-inch, and 50,610 lineal feet of 6-inch, water main extensions, and all related appurtenances, in three service areas within Richland County, Illinois. Water mains will be extended along the following segments: the North Frontage Road of US Route 50, east of Olney; Meridian Road, from Antioch to Radio Tower Lanes, with short spurs on Antioch and Dayton Lanes; Crest Haven Road, from Antioch to Mt. Pleasant Lanes; Mt. Pleasant Lane, from Crest Haven to Wood River Roads; Wood River Road, from Mt. Pleasant Lane to County Road 675 N; Countryside Lane, from Wood River to Stringtown Roads, with a short spur on Springtown Road; Memphis Road, from County Road 675 N to Ebenezer Lane; Ebenezer Lane, from Nashville to Oaktree Roads; Nashville Road, from Ebenezer to Gallagher Lanes; Oaktree Road, from Ebenezer Lane to Cleaver Road; Cleaver Road, from Oaktree Road to west of Shell Road; Shell Road, from Cleaver Road to Elbow Lane, and a short spur on Elbow Lane. Bids are requested for the following Contract: EJ Water Cooperative, Inc. Phase 82 Water Main Improvements, Olney, Claremont, & Bonpas Townships, Richland County. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Milano & Grunloh Engineers, LLC, 114 W. Washington Avenue, Effingham, IL 62401 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Pre-bid Conference -N/A A certified check or bank draft, payable to the order of Richland County, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Specifically, the Contractor shall complete and return the Intent to Comply with Section 3 Requirements with their submitted Bid. Bidders must not be excluded from participating in any federal assistance program [24 CFR 85, Subpart C 85.35; 2 CFR 200.214]. Richland County reserves the right to reject any or all Bids or to waive any informalities in the bidding. Bids may be held by the Richland County for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The following waivers apply to this Contract: BABAA De Minimis, Small Grants, and Minor Components

Award

Water / Sewer

$1,219,187.00

Public - City

Site Work

42

15

4

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
42
Bidding Soon
307
All Active Projects
148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 17, 2025

img_map_placeholder

Multiple Locations, Olney, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 82 Water Main Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.