Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2025 at 8:00 PM
Updated April 5, 2025
Renovation of a medical facility in Columbus, Ohio. Completed plans call for the renovation of a 18,650-square-foot, two-story above grade medical facility.
Location Columbus, OH All questions for additional information should be directed to Sam Rosenthal at the office of the Architect at srosenthal@schooleycaldwell.com, in writing only. Bidders requiring clarification or interpretation of the bidding documents may email a question until 5:00 p.m. on March 25 , 2025, A. Work of this Contract comprises a limited scope interior renovations of the restroom facilities on 3 levels of the ADAMH building. B. Work generally consists of the following Work: 1. Interior restroom upgrades on three levels in the building including Men's and Women's restroom facilities. This work includes selective demolition of interior construction in the restroom including plumbing fixtures, partitions, toilet accessories, and all finishes in the restrooms. 2. New finishes include metal framed and gypsum board partitions, acoustical ceilings, tiling, painting, toilet compartments, toilet accessories, countertops and interior signage. 3. New plumbing, mechanical, electrical systems within the areas of the remodeled restrooms and within the scope of the work. 4. All other work identified in the contract documents. C. The work of this Project is shown on the Drawings and described in Divisions 0-49 of the Specifications. D. Should discrepancies or omissions be found from the Drawings or Specifications, or in doubt as to their meaning, notify the Architect. In submitting his/her proposal, the Contractor acknowledges and agrees that the Contract documents are entirely adequate and sufficient to provide for the completion of the Work, and include all work, whether or not shown or described, which reasonably may be inferred to be required or useful for the completion of the Work. E. All temporary and permanent utilities shall be provided by Contractor until Substantial Completion and a Temporary Occupancy Permit is obtained. F. Contractor must obtain approved Certificate of Occupancy prior to final Punch List and Owner's occupancy of the remodeled areas.
Post-Bid
Medical
$600,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 6, 2025
447 E Broad St, Columbus, OH
Related To This Project
Columbus, OH
Bid Date: Jan 27 2025
Columbus, OH
--
Columbus, OH
Bid Date: Apr 14 2025
Columbus, OH
Bid Date: Jan 31 2025
Columbus, OH
Bid Date: Feb 07 2025
Columbus, OH
Bid Date: Feb 26 2025
Columbus, OH
--
Columbus, OH
Bid Date: Feb 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
