BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated February 12, 2025

Site work and paving for a mixed-use development in Jackson, Mississippi. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Medgar Evers Boulevard from Woodrow Wilson Avenue to Ridgeway Street for a total project length of 1.59 miles, Federal-Aid The work shall consist essentially of the following items: 1. Reconstruction improvements; 2. Improved traffic signalization; 3. Replacing and/or upgrading water and sewer utility lines where needed as well as storm drainage; 4. Sidewalk with ADA compliance. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. The attention of bidders is directed to the Contract Provisions governing selection and employment of labor. Minimum wage rates for Federal-Aid projects have been predetermined by the Secretary of labor and are subject to Public Law 87-581 Work hours Act of 1962, set forth in the Contract Provisions. The City of Jackson hereby notifies all Bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged and women's business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The proposal and contract documents in its entirety shall be submitted in a sealed envelope and deposited with the City Clerk, 219 South President Street Jackson, MS prior to the hour and date above designated. No bidder may withdraw his bid within sixty (60) days after the date of actual bid opening, without Owner's consent. Work to be performed shall be in accordance with the Mississippi State Highway Standard Specifications for Road and Bridge Construction, 2017, together with all amendments and/or special provisions and/or addenda to the standards duly approved and adopted, unless otherwise noted in these specifications. The attention of Bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. No bid proposal will be sold at, of the day preceding the Advertised Date for receipt of bids. All documents required for bidding purposes may be obtained from online

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
34
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

Project location map

Medgar Evers Blvd, Jackson, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.