BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2025 at 7:00 PM

Updated May 1, 2025

Demolition, site work and paving for a bridge / tunnel in Albany, New York. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Owner is Saratoga County and the work site is located in the Towns of Halfmoon and Stillwater. The projects limits extend from: 208ft south and 134ft north of the bridge. County Bid #: 25-PWCCRAKBR-1 PIN1761.78, D#040249; BIN 2202750, LIN 10 The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: removal of the existing superstructure and substructure. Construction of new integral concrete abutments supported on augured steel H-piles founded on rock. Installation of a new single span steel multi-girder superstructure with a cast-in-place concrete deck. Construction of the new structure will done in one phase by closing the bridge and detouring traffic around. This bridge spans Anthony Kill and will require all work to conform to the applicable environmental permits. This is a Federal Aid Project and NYSDOT Standard Specifications, officially finalized and adopted on September 1, 2024 as posted on the New York State Department of Transportations website must be followed by the successful bidder. Question Deadline 01/26/2025 at 11:59 PM ET The DBE goal for this project is: 6.0% The EEO Employment goals for this project are: 3.2% Minority Employment Goal 6.9% Women Employment Goal Questions regarding the Contract Documents should be directed to Creighton Manning Engineering, LLP either through email at: abrown@cmellp.com or by telephone at 518-689-1823. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The work will be substantially completed 11/14/2025 and completed and ready for final payment on 12/14/2025. Contract term: Substantial Completion November 14,2025

Bid Results

Bridges / Tunnels

$1,316,797.00

Public - County

Demolition, Paving, Site Work

40

11

2

6

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
190
Bidding Soon
2,277
All Active Projects
979
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

Multiple Locations, Albany, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.