Site work, paving and outdoor lighting for a mixed-use development in Katy, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a sidewalk / parking lot; water / sewer project; playground / park / athletic field; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a sidewalk / parking lot.
**As of April 03, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Phase 1 Park and Trail Development This project encompasses conversion of dry detention to wet bottom pond, drainage improvements, addition of a concrete trail system, and park amenities in accordance with the MUD 3 Master Plan Question Deadline 02/25/2025 at 5:00 PM CT Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system for such information to Landscape Architect not less than ten (10) calendar days before the Bid opening. Scope of Work for the Construction Contract, including all material, labor, and supervision or incidentals, will entail: Excavation for a wet bottom pond, Clay liner, Soil separation and Stockpiling, Soil placement in lifts, Selective Grading and Site Drainage, Wetlands construction, Bridges and Boardwalks on helical piers, Site lighting and electrical service, Site Utilities, Cast-in-Place concrete retaining walls, Concrete flatwork, Playground and Site Amenities, Planting, and Irrigation. Each Bid must be accompanied by a Bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within one (1) business day of receipt of the bid opening. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. All site visits shall be coordinated and scheduled with the Owner. The undersigned will achieve Substantial Completion of the Work within 420 calendar days after the date of the written Notice to Proceed and will achieve Final Completion of the Work within an additional 30 calendar days. Project Identification: PHASE 1 PARK AND TRAIL DEVELOPMENT 1. Project Location: 527-1/2 New Hope Lane, Katy, Texas 77494 B. Owner: Harris-Fort Bend Counties Municipal Utility District No. 3 C. Landscape Architect: Talley Landscape Architects, Orchard, Texas, 77464, 281- 341-5601. The Work of the Project is defined by the Contract Documents and consists of the following: 1. General Conditions, Bonds, Insurance, Payment Procedures. 2. Excavation for a wet bottom pond, Clay liner, Soil separation and Stockpiling, Soil placement in lifts, Selective Grading and Site Drainage, Wetlands construction, Bridges and Boardwalks on helical piers, Site lighting and electrical service, Site Utilities, Cast-in-Place concrete retaining walls, Concrete flatwork, Playground and Site Amenities, Planting, and Irrigation. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project. Work Restrictions, General: Comply with restrictions on construction operations. 1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction.
Bid Results
Sidewalks / Parking Lot
$13,076,545.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
April 1, 2025
527 New Hope Ln, Katy, TX
Related To This Project
Katy, TX
Bid Date: Feb 07 2025
Katy, TX
Bid Date: Feb 06 2025
Katy, TX
--
Katy, TX
--
Katy, TX
--
Katy, TX
--
Katy, TX
Bid Date: Feb 11 2025
Katy, TX
--
Katy, TX
Bid Date: Jan 23 2025
Katy, TX
--
Katy, TX
Bid Date: Mar 08 2019
Katy, TX
Bid Date: May 05 2021
Katy, TX
Bid Date: Jan 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.