Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated March 27, 2025
Renovation of an educational facility in Montgomery, New York. Completed plans call for the renovation of a educational facility.
Valley Central School District 2023 Capital Project Phase 2 - Plumbing Construction Description - Science Wing Renovations at Valley Central High School. - Classroom Unit Ventilator Replacements and Cafeteria Air Conditioning Installations at Berea Elementary School. - Classroom Unit Ventilator Replacements, Cafeteria Air Conditioning Installations, HVAC Control Upgrades, and Boiler Replacements at East Coldenham Elementary School. - Classroom Unit Ventilator Replacements, Electrical Panel Replacements, Gymnasium Air Handling Unit Replacements, Cafeteria Air Conditioning Installations, HVAC Control Upgrades, and Boiler Replacements at Montgomery Elementary School. - Emergency Lighting Installations and Fire Escape Refinishing at Maybrook Alternative Learning Center. The Owner, the Valley Central School District will receive sealed bids to furnish material and labor to complete the Valley CSD 2023 Capital Project Ph 2 which includes renovations and alterations. Each bid shall be on a stipulated sum basis for the following contracts Document notes Complete sets of Bidding Documents, Drawings, and Specifications, on compact disc (CD) or USB flash drive may be obtained from Rev, 28 Church Street, Warwick, New York 10990 Tel: (845) 651-3845, upon depositing the sum of one-hundred dollars ($100.00). Checks or money orders shall be made payable to Valley Central School District. Any bidder requiring paper copies of the Bidding Documents, Drawings and Specifications shall make arrangements directly with the printer and pay for all printing, packaging and shipping costs. Such costs are non-refundable. Pre-Bid Meeting notes Walkthroughs will commence after the Pre-Bid Conference at Valley Central High School, East Coldenham Elementary School, Berea Elementary School, Montgomery Elementary School, Maybrook Alternate Learning Center, and Walden Elementary School. Attendance of this meeting is recommended as the Owner, Architect and/or consultants will be present to discuss the Project. Attendees should anticipate 30 minutes Q & A session. For bidders unable to attend this conference or requesting additional opportunity to visit the site(s), arrangements can be made for appointment, by contacting William Devine, The Palombo Group, Construction Manager, Office: 845-868-1239 and Cell: 845-554-7631 This project is publicly funded. The Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Valley Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. Maybrook Alternative Learning Center 44-13-01-06-0-002-014 Montgomery Elementary School 44-13-01-06-0-004-016 Walden Elementary School 44-13-01-06-0-009-022 East Coldenham Elementary School 44-13-01-06-0-013-020 Valley Central High School 44-13-01-06-0-015-034 Berea Elementary School 44-13-01-06-0-017-015
Bid Results
Educational
$497,894.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2025
March 17, 2025
Multiple Locations, Montgomery, NY
Related To This Project
Montgomery, NY
Bid Date: Feb 14 2025
Montgomery, NY
--
Montgomery, NY
Bid Date: Mar 28 2025
Montgomery, NY
Bid Date: Mar 28 2025
Montgomery, NY
Bid Date: Mar 28 2025
Montgomery, NY
Bid Date: May 28 2025
Montgomery, NY
Bid Date: May 30 2025
Montgomery, NY
Bid Date: May 30 2025
Montgomery, NY
Bid Date: Feb 14 2025
Montgomery, NY
Bid Date: Feb 14 2025
Valley Central School District 2023 Capital Project Phase 2 - Hazardous Material Abatement - 5650852
Montgomery, NY
Bid Date: Feb 14 2025
Montgomery, NY
--
Montgomery, NY
Bid Date: May 08 2025
Montgomery, NY
--
Montgomery, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
