Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 16, 2025 at 7:00 PM
Updated February 15, 2025
Renovation of a municipal facility in Greenville, North Carolina. Completed plans call for the renovation of a 127,794-square-foot municipal facility.
One-Two Sentences The original 1969 complex consists of three separate towers with connectors for a total of approximately 127,794 square feet. The complex is composed of classrooms and offices, but it functions primarily as a laboratory building. The lab spaces are isolated and cannot sufficiently support open collaborative lab research. Howell's utility systems are near the end of their useful life. This project is intended to address deferred maintenance throughout including building systems, life safety, accessibility, code compliance and abatement. The construction must be completed in multiple phases as two of the towers will always be occupied during construction requiring continuous MEP and network service throughout the project. This project's renovation in the North tower will require sequencing/coordination to prevent adversely affecting occupancy in other areas with an 18-month construction duration. The scope of this project will also include flood proofing the South tower lower level.
Post-Bid
Municipal
$46,000,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2025
October 14, 2025
28879 E 10th St, Greenville, NC
Related To This Project
Greenville, NC
--
Greenville, NC
Bid Date: Feb 13 2025
Greenville, NC
Bid Date: Mar 12 2025
Greenville, NC
--
Greenville, NC
Bid Date: Jan 28 2025
Greenville, NC
Bid Date: Jan 24 2025
Greenville, NC
--
Greenville, NC
Bid Date: Jan 29 2025
Greenville, NC
--
Greenville, NC
Bid Date: Jan 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
