Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 16, 2025 at 7:00 PM
Updated January 18, 2025
Renovation of a municipal facility in Columbus, Ohio. Conceptual plans call for the renovation of a municipal facility.
The Ohio Department of Natural Resources (ODNR), through the Division of Parks and Watercraft is responsible for the operation and management of Ohio State Parks, eighteen (18) of which offer nightly and weekend rental opportunities of individual one, two, three, and four-bedroom cabins. These cabins were built between 1940 and 1990 with minor renovations completed since they were originally constructed. ODNR has conducted assessments and several rounds of improvements to the cabins over the last several capital biennia. ODNR is seeking professional design services for the next stage of the statewide cabin improvements. The focus of this project will be a continuation of assessments and renovations of existing cabins throughout the state. The intent of this project is to address the need for improvements and renovations for cabins at Lake Hope, Mohican, and Dillon State Park. Renovations at Lake Hope are planned to include seventeen (17) to twenty (20) cabins and will include kitchenette and bathroom remodels, finish upgrades, FF&E replacements, window replacements, exterior and interior painting, and mechanical system upgrades. ODNR has developed a "full" renovation program for its standard two-bedroom cabins and a "partial" renovation program for the non-standard historic cabins at Lake Hope. The "partial" planned renovations at Mohican include new windows and HVAC systems; new furnaces / air conditioning units are planned for at twenty-five (25) cabins and window replacements at nine (9) cabins. At Dillon, partial renovations include roof replacements at twelve (12) cabins that have not been replaced. Additionally, assessments and design effort will be undertaken at Maumee Bay and Tar Hollow; Tar Hollow, a historically significant location, will have assessments for the four (4) larger group cabins and the twenty-eight (28) standard cabins and are planned to include ADA accommodations in the group lodge and one (1) standard cabin. Maumee Bay scope will include assessments and conceptual designs for all twenty-four (24) 2- bedroom and 4-bedroom cabins for interior renovations including provisions for ADA accommodations. In addition to the renovations and assessments, a decommissioning plan of sixteen (16) previously assessed cabins at Lake Hope (3), Buck Creek (3), Hueston Woods (3), and Pymatuning (7) State Parks cabin sites. While all these locations have been identified as a part of this phase of ODNR's Statewide Cabin Improvement Program, ODNR may elect to include similar scopes of work at additional cabin locations throughout the state should funding allow. All regulatory and environmental regulations and permitting will be the responsibility of the A/E selected for this project. Archaeological assessments and US Army Corp of Engineers (USACE) coordination may be required depending on property type and location. While ODNR anticipates centralized services from the selected Consultant at the ODNR Fountain Square complex at 2045 Morse Road, Columbus, Ohio 43229, travel will be necessary to complete the services. For the purposes of scoring proximity to project site, the ODNR Fountain Square complex will be considered the project site. The development of a complete Program of Requirements (POR) will also be included as part of the Professional Design as an Additional Service. The proposed project scope will be evaluated and prioritized, relative to each proposed location, to align with the project budget. Evaluation of the project/construction schedule will also be part of the POR stage. The effort may be further developed by utilizing facility and site assessments. EDGE Participation Goal Percent of initial Total A/E Fee: 5.0% Construction Notice to Proceed: 07 / 26 Substantial Completion of all Work: 05 / 28 For projects advertised with an appropriately developed Program of Requirements ("POR"), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Estimated Project Cost : $7,827,000. Submit all questions regarding this RFQ in writing to engineering@dnr.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website at online on a regular basis until one week before the response deadline. Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your firm's name. Use the "print" feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Also, please label the CD or DVD and the sleeve with the project number and firm name if applicable. Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or coverings of any type. Cover letters and transmittals are not necessary. The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
$7,827,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2025
July 26, 2025
Multiple Locations, Columbus, OH
Related To This Project
Columbus, OH
Bid Date: Feb 07 2025
Columbus, OH
Bid Date: Feb 26 2025
Columbus, OH
Bid Date: May 08 2025
Columbus, OH
Bid Date: Feb 12 2025
Columbus, OH
Bid Date: Feb 26 2025
Columbus, OH
--
Columbus, OH
Bid Date: Apr 14 2025
Columbus, OH
--
Columbus, OH
Bid Date: Jan 27 2025
Columbus, OH
Bid Date: Apr 04 2025
Columbus, OH
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
