BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work for a water / sewer project in Sanibel, Florida. Completed plans call for site work for a water / sewer project.

**As of March 19th, 2025, the project was awarded to EZ Contracting, LLC, with an awarded amount of $2,390,379.43.** **As of March 19th, 2025, the project was awarded to EZ Contracting, LLC, with an awarded amount of $2,390,379.43.** The work for which proposals are to be received consists of the following: Post Hurricane Ian Stormwater System Damage Repairs . Proposals shall be properly and completely executed on a standard proposal form. Each proposal shall be accompanied by an acceptable certified check or cashiers check made payable to the City of Sanibel, or an acceptable Bidders Bond, in an amount not less than five percent (5%) of the total bid price. The Contractor to whom the work is awarded will be required to furnish an acceptable Surety Bond in an amount of one hundred percent (l00%) of the contract price. No bidder may withdraw his proposal within a period of sixty (60) days following the date set for receiving proposals. The City of Sanibel reserves the right to hold any and all bids for a period of not more than sixty (60) days and said bids shall be and remain valid and in full force and effect during said period. The City of Sanibel reserves the right to reject any and all proposals and to waive informalities. NON-MANDATORY No Pre-Bid Conference. For questions please contact Scott Krawczuk at scott.krawczuk@mysanibel.com. SEALED ENVELOPES MUST BE MARKED WITH THE TITLE OF THE BID, BID NUMBER, NAME AND ADDRESS OF THE BIDDER. NO QUESTIONS WILL BE ACCEPTED AFTER: 5:00 PM, (ET) February 3, 2025, all questions must be submitted in writing to scott.krawczuk@mysanibel.com and received by stated time. The work consists of repairing damages to the stormwater system on Sanibel as specified in these plans and contract documents. The work includes but is not limited to: sediment removal from swales and culverts, repair of catch basin inlets, and repair of pipe end treatments. The complete list of repairs is provided separately, along with a location map. The above work includes all the construction necessary to provide a functioning gravity stormwater management system. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the Contract. All work under this section shall be performed as specified in the above section of the FDOT Standard Specifications for Road and Bridge Construction, latest edition, and the Contract Documents, except as modified herein. Contractor shall accurately locate all underground utilities and take the required measures necessary to protect them from damage. All underground utilities shall be kept in service at all times. The contract work provides for the Periwinkle Way Milling and Resurfacing and other related items pertinent and incidental thereto including the furnishing of all labor, materials, supplies, equipment, work and services, ready for satisfactory and continuous operation, in accordance with the drawings and specifications. B. The work included in this contract is described briefly as follows: City of Sanibel Post Hurricane Ian Stormwater System Damage Repairs C. Construction anticipated start date is April 2025.

Award

Water / Sewer

$2,390,379.00

Public - City

Site Work

91

7

2

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
92
Bidding Soon
816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 1, 2025

Project location map

Multiple Locations, Sanibel, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.