BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work and paving for a mixed-use development in Friant, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and service station / car wash facility.

This project is being bid in accordance with Government Code 14838.7 and is open only to Small Business and Micro Business contractors certified through the California Department of General Services, Office of Small Business and DVBE Services. Project comprises labor, material and services necessary for: Major components of Project Work consist of install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain. License required to bid the project: C-10 Certificate of Reported Compliance (CRC) Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract. Scope of Work: Major components of Project Work consist of install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain. Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. States estimated cost: $159,885.00. The term of this project is 60 calendar days. The States Project Director is Janelle Goulding at (916) 823-7059 Pre bid notes: Virtual Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended the MANDATORY VIRTUAL pre-bid site inspection tour at which time representatives of the State and prospective bidders shall meet virtually in the Microsoft Teams platform, at which time a site plan and video presentation will be presented to bidders. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. Install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the requires saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Provide and install all items shown on the drawings and as specified unless otherwise noted as not in contract or existing to remain in conformity with the Drawings and Specifications hereinafter identified; including furnishing all material, labor, plant, tools, equipment, and services necessary therefor and incidental thereto, complete and ready for use, except as hereinafter otherwise provided. The Specifications are those bound in the Project Manual and enumerated in the Table of Contents. The General Conditions of the Contract for Construction, Supplementary Conditions, and Division 01 of the Specifications apply to all Work of this Contract. Contractor shall keep drainage facilities, walks, and paved areas clean and free of mud and dirt, obstacles, etc. so that normal drainage and pedestrian and vehicular travel may be maintained. Should the Contractor discover conflicts, omissions, or errors in the Contract Documents, or have any questions concerning interpretation or clarification of Contract Documents, the Contractor shall immediately submit to the State in writing an RFI that complies with the following requirements:

Post-Bid

Service Station / Car Wash

$159,885.00

Public - State/Provincial

Paving, Site Work

15

17

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
0
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

5290 Millerton Rd, Friant, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.