EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Aurora, Illinois. Completed plans call for the renovation of a educational facility.

West Aurora SD Roofing Improvements Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to "West Aurora School District #129." No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. Tentative Commencement of Work on Site: March 31, 2025 1. From March 31, 2025 to April 5. 2025 there are no timeframe restrictions such that the sites can 2. be safely occupied starting at 6:00 a.m. April 6, 2025. No timeframe restrictions resume June 2, 2025. Requests for Interpretations: 1. Submit requests for interpretation of the documents in writing to the Architect. Inquiries received five or more days prior to the date fixed for opening of the Bids will be given consideration. 2. Responses to requests for interpretation will be issued as Addenda. Addenda will be issued to bidders of record. It is the responsibility of the bidders to check to be certain they have the issued Addenda. Final Completion: August 11, 2025. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in- formalities in bidding. Subcontractors are encouraged, but not required to attend. After the pre-bid meeting, everyone shall visit the site to view the area of work, gather additional information, and ask specific questions. There shall be only one scheduled walk-through of the site. Attendance shall be taken at the site to ensure that all contractors have visited the site. Non-attendance can be grounds for rejection of bid.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

9

12

14

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Decking, Steel Decking
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles, Membrane Roofing, Built-Up Bituminous Roofing, Fluid-Applied Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim
Division 08 - Openings

Division 08 - Openings

Windows, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Carpeting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Electrical and Cathodic Protection, Facility Lightning Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
103
Bidding Soon
2,288
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

March 31, 2025

img_map_placeholder

Multiple Locations, Aurora, IL

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Roofing Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.