Published January 24, 2025 at 7:00 PM

Updated January 31, 2025

Site work and paving for a civil project in Omaha, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work Consists Essentially of the Following Estimated Quantities: Approximate Quantities Item Description Quantity Unit Site Preparation 1 Install Silt Fence 350 Lf 2 Maintain Silt Fence 350 Lf 3 Remove Existing Fence 325 Lf 4 Saw Cut, Full Depth 2,155 Lf 5 Remove Concrete Pavement 55 Sy 6 Excavation, on-site 9,170 Cy 7 Install Seeding, Type "Row Mix" 1.9 Ac 8 Install Seeding, Type "Temporary Mix" 1.1 Sy 9 Install Rolled Erosion Control, Type I 13,150 Sy 10 Traffic Control 1 Ls 11 Install Ornamental Fence 64 Lf 12 Install Inlet Protection 8 Ea 13 Remove Silt Fence 260 Lf Storm Sewer 101 Connect Manhole to Existing Storm Sewer 1 Ea 102 Connect to Existing Manhole 1 Ea 103 Construct 18" Rcp (Class Iii) W/type R2 Aggregate Bedding 922 Lf 104 Construct 24" Rcp (Class Iii) W/type R2 Aggregate Bedding 895 Lf 105 Construct 30" Rcp (Class Iii) W/type R2 Aggregate Bedding 222 Lf 106 Construct 54" I.d.storm Manhole (2 Ea) 12 Vf 107 Construct Ring Collar on Storm Sewer Manhole 2 Ea 108 Construct Curb Inlet, Type Iii 7 Ea 109 Construct 30" R.c. Flared End Section 1 Ea 110 Install R.c. Pipe Couplers 6 Ea 111 Install Rip-rap, Type B 48 Tn Paving 201 Subgrade Preparation 3,860 Sy 202 Construct 6" Aggregate Base Course 1,940 Sy 203 Drill and Epoxy No. 5 X 18" Tie Bars @ 4' O.c. 520 Ea 204 Construct 10" Concrete Pavement (Opw 3500) 1,190 Sy 205 Construct 6" Concrete Trail (Opw 35000) 2,490 Sy 206 Construct 6" Concrete Median Surfacing 120 Sf 207 Install Curb Ramp W/detectable Warning Panel 356 Sf 208 Permanent Pavement Marking, Grooved, 6" Solid White Striping 1,765 Lf 209 Permanant Pavement Marking, Grooved, Solid White Right Arrow Marking 4 Ea 210 Permanent Pavement Marking, Grooved, Solid White Crosswalk Stripping 2 Ea 211 Permanent Pavement Marking, Grooved, Solid Stop Bar Marking 2 Ea All proposals must be submitted on bid forms furnished by FOLEYSHALD ENGINEERING, and must be accompanied by a bid bond or a certified check in the amount not less than $35,500.00 made payable to the Treasurer of Sanitary and Improvement District 362 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed, and addressed to the Clerk of Sanitary and Improvement District 362 and shall be marked PROPOSAL FOR SID 362 OAK LEAF- EXTERIOR PAVING-PHASE I with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked BID SECURITY with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. Omaha Nebraska Sanitary and Improvement District 362 of Sarpy County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities.

Post-Bid

Water / Sewer

$710,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
94
Bidding Soon
838
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

Multiple Locations, Omaha, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.