BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

This is a service / maintenance or supply contract in Aden, Alberta. Contact the soliciting agency for additional information.

The purpose of the Crowsnest Pass Flood Study is to assess and identify flood hazards along the Crowsnest River and 9 tributaries through Crowsnest Pass and Municipal District of Pincher Creek. The study area includes 56 km of the Crowsnest River and significantly shorter lengths of Allison, Blairmore, Drum, Gold, Lyons, McGillivray, Nez Perce, Star, and York Creeks, totaling 19 km. The study also includes a supplementary component of work to assess and identify debris flood and debris flow hazards for an alluvial fan in the study area. The study will be completed under the provincial Flood Hazard Identification Program (FHIP), the goals of which include enhancement of public safety and reduction of future flood damages through the identification of flood hazards. The provincial study is being co-funded through the federal Flood Hazard Identification and Mapping Program. Estimated Contract Start Date Apr 1, 2025 Estimated Contract End Date Mar 31, 2027 Estimated Contract Duration 1 Year(s) -- 52 Week(s) -- 0 Day(s) If you have questions, please contact the Contact Person below only by email. Contact Person Lance Katan Fluvial Hydraulics & Geo Spec Method of Contact EPA.Flood@gov.ab.ca The method of Contractor Selection has not been Determined at this time

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
6
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

Multiple Locations, Aden, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.