Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Site work for a civil project in Sacramento, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

USACE SPK DBB Construction - SRE C5 Pioneer Bridge Levee Improvements - Sacramento, CA Project No: 456852 AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge. The Bidder Inquiry System will be unavailable for new inquiries 10 calendar prior to the bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the , if necessary. The contractor shall begin performance within 10 calendar days and complete it within 180 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$170,321.00

Public - Federal

Site Work

25

16

13

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
80
Bidding Soon
2,665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

Interstate 80, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.