Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 15, 2025 at 7:00 PM
Updated February 16, 2025
Site work, paving and outdoor lighting for a mixed-use development in Wilsonville, Oregon. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
Proposals from firms experienced in providing engineering services for upgrade of approximately 2,600 linear feet of SW Stafford Road between Boeckman Road and SW Kahle Road. The scope will include engineering and preparation of construction documents for roundabouts, roadways, sidewalks, bike facilities, planter strip with street trees, water quality facilities, storm water conveyance facilities, street lighting, utility undergrounding, and signage and striping. Work is expected to begin in March 2025 and continue through December 2027. The contract resulting from this RFP shall have an anticipated date of final completion of December 31, 2027 Direct any questions regarding this solicitation to Andrew Barrett at (503)570-1567 or abarrett@ci.wilsonville.or.us. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$1,000,000.00
Public - City
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2026
SW Stafford Rd, Wilsonville, OR
Related To This Project
Wilsonville, OR
Bid Date: Mar 27 2025
Wilsonville, OR
Bid Date: Apr 09 2025
Wilsonville, OR
--
Wilsonville, OR
Bid Date: Jun 03 2025
Wilsonville, OR
Bid Date: Jun 16 2025
Wilsonville, OR
Bid Date: Jul 02 2025
Wilsonville, OR
Bid Date: Jun 24 2025
Wilsonville, OR
Bid Date: Sep 11 2025
Wilsonville, OR
--
Wilsonville, OR
--
Wilsonville, OR
Bid Date: Oct 09 2024
Wilsonville, OR
--
Wilsonville, OR
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
