BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work and paving for a road / highway in Norwalk, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than August 29, 2025. Bidders must comply with the prevailing wage rates on Public Improvements in Huron County, Ohio as determined by the Ohio Department of Commerce, Bureau of Wage and Hour Administration, (614) 644-2239. The Board of County Commissioners of Huron County reserves the right to waive any and all irregularities in the bids or bidding process and may reject any and all bids. The Contractor shall furnish, at its own cost and expense, all management, labor, tools, forms, equipment, appliances, machinery, transportation, materials and other things necessary, of whatever nature, to perform the Work, and shall perform and complete, within the time limit specified, all of the Work indicated or implied by the including the Notice to Bidders, Instructions to Bidders, General & Supplemental Provisions, Standard Specifications, Scope of Work, Plans & Specifications, and Estimated Quantities prepared for this Project, including the removal of surplus or condemned materials, and the thorough cleaning of the site of the Work and structures built. In no case will any Work, in excess of such requirements, be paid for unless ordered in writing by the County as hereinafter specified. All Work shall be of the best quality throughout. Unless otherwise provided herein, all materials shall be new. 2. SCHEDULE OF PERFORMANCE At the pre-construction meeting, the Contractor must provide the Engineer with a printed schedule showing the interrelation and planned performance of all major items of Work, with completion reasonably scheduled thereon to occur by the scheduled completion date recited herein. The Engineer shall review and consider acceptance of the schedule as provided by section 108.02 (B) (1) of the Standard Specifications

Bid Results

Roads / Highways

$1,080,706.00

Public - County

Paving, Site Work

4

6

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
203
Bidding Soon
2,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

June 30, 2025

Project location map

Multiple Locations, Norwalk, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.