EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Gurnee, Illinois. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The project consists of Installing approximately 3800 LF - 8" PVC C900 WM, 1325 LF - 6" PVC C900 WM, 13 EACH - Fire Hydrants, 1 EACH " Fire Hydrant Relocation, 11 Each " 8'Gate Valve in 4'Vault, 1 EACH " 6' Gate Valve in 4 Valve Vault, 71 -1.5 water service connection, 225 FT " Remove and Replace Culvert, 335 FT 12 Water Main Quality Storm Sewer, 63 FT 8" Water Main Quality Storm Sewer, 3 EACH 4' Diameter, Type A, Manhole, Type 8 Grate, 5,500 SY - Topsoil Furnish and Place, and all other work necessary to complete the improvements. Bid security shall be furnished in accordance with the Instructions to Bidders. Bids will be accepted only from Bidders prequalified by the Owner. Contact Daniel Salgado, 847-599-7583 for information regarding this project or prequalification requirements. Please submit prequalification certificates to engineering@village.gurnee.il.us. All official notifications, addenda, and other Bidding Documents will be offered only through the Village of Gurnee's website and e-mail. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as provided in Check Sheet LRS 6 of the Supplemental Specifications and Recurring Special Provisions prepared by the Department of Transportation. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Construction work may begin as soon as May 1st, 2025 weather permitting.

Award

Water / Sewer

$1,767,200.00

Public - City

Site Work

34

10

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
177
Bidding Soon
2,614
All Active Projects
1,160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

May 1, 2025

img_map_placeholder

Multiple Locations, Gurnee, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Water Main Improvements Stoney Island Region Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.