BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2025 at 7:00 PM

Updated January 28, 2025

Renovation of a municipal facility in Greenville, North Carolina. Conceptual plans call for the renovation of a municipal facility.

MC - Replacement Steam MH-JO5 to Jones and MH-WD5 to Fletcher Res Halls One-Two Sentences This Multi-site project consists of replacement of the existing steam infrastructure on Main Campus from the steam manhole JO5 to Jones Residence Hall and from steam manhole WD5 to Fletcher Residence Hall. Construction is generally summer time and is expected to begin in the late spring of 2026 and be completed before students return to campus in August 2026. Current project authorization is for advance planning only. The selected firm will be retained through full design and construction at the university's option.

Conceptual

Municipal

$2,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
78
Bidding Soon
913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

Multiple Locations, Greenville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.