Published February 9, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The deadline to ask questions is 2/05/2025 10:00 AM CST Bidders desiring further information or interpretation must request such information or interpretation from the ENGINEER. Should a Bidder discover a discrepancy or an omission in plans or specifications, he should at once notify the ENGINEER via the Q&A feature for the project on CivCast so that an addendum can be issued. No explanation or interpretation other than an addendum issued by the ENGINEER will be considered official or binding. This project includes the connection to an existing 24-inch waterline stub out in the CenterPoint Corridor approximately 275-feet east of the Veteran's Memorial and Beltway 8 Intersections, construction of 12-inch, 20-inch, and 30-inch diameter waterlines to convey surface water to Fallbrook UD. Additionally, the project includes a City of Houston meter station and a meter station at the Fallbrook UD water receiving facility. Proposals must be accompanied by a certified or cashier's check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 5% of the amount bid. The amount of said certified or cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liable to the OWNER for the amount in the event the successful bidder shall fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award. If a certified or cashier's check is provided, the successful bidder shall deliver, at the ENGINEERS office (IDS Engineering Group, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040), the original certified or cashier's check within twenty-four (24) hours of the bid opening. The successful bidder must furnish a performance bond and a payment bond on the forms provided, each in the amount of 100% of the Contract price from a surety company licensed by the State of Texas. This contract is contingent upon release of funds from the Texas Water Development Board. Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a loan or grant from the Texas Water Development Board. Neither the State of Texas, nor any of its departments, agencies, or employees are or will be a party to the Notice to Bidders or any resulting contract. The OWNER reserves the right to reject any or all bids and to waive informalities or irregularities in bidding. In case of lack of clarity in stating prices, the OWNER reserves the right to consider the most advantageous construction thereof, or reject the bid.

Bid Results

Water / Sewer

$13,373,612.00

Public - County

Site Work

135

36

13

8

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, First Aid Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Chemical Sampling and Analysis of Soils, Subsurface Investigation, Material Testing, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Fibrous Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Concrete Topping, Grouting, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Exterior Protection, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Pedestrian Control Equipment, Pedestrian Gates, Commercial Equipment, Mercantile and Service Equipment, Office Equipment, Entertainment Equipment, Musical Equipment, Bells, Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central Cooling Equipment, Cooling Towers, Decentralized HVAC Equipment, Humidity Control Equipment, Dehumidifiers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining, Tunnel Excavation, Tunnel Construction, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Subdrainage, Drainage Layers, Fuel Distribution Utilities, Natural-Gas Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Machining Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
2,320
All Active Projects
974
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 10, 2025

img_map_placeholder

Multiple Locations, Houston, TX


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Package 1 Proposed 30, 20, and 12 Water Lines From Beltway 8 Meter Station to Fallbrook UD WP No. 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.