Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work and paving for a civil project in Fairmont, Illinois. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The work consists of installation of approximately 72 linear feet of 6-inch ductile iron water main, 2065 liner feet of 8-inch ductile water main, 1102 linear feet of 10- inch ductile iron water main and fire hydrants, valve vaults and new water services. Install approximately 2247 linear feet of 10-inch PVC sanitary mains and new sanitary services. There will also be road resurfacing, pavement patching and landscape. All bidders will be required to submit Bid Security in the form of a Certified Check, Cashier's Check or a Bid Bond in the amount of Ten percent (10%) of the Base Bid, payable to the City of Joliet. Bid Security: 10% Performance Security: 100% For the Fairmont project area, all work, as shown in the Plans, must be substantially complete by Monday, August 18, 2025. Final Completion: September 8, 2025. The Contractor shall not commence work under this contract until he has obtained and submitted both a Performance Bond and a Labor and Material Payment bond to the City and such bonds have been approved by the City. Such bonds shall cover such performance, labor or materials used in the work whether by the Contractor or by any subcontractor. Said bonds shall remain in full force and effect for the duration of the contract and during the term of any guaranty or warranty period required by the Contract Documents. The performance bond shall be conditioned on the full and faithful performance of the contract according to its terms and shall be in an amount of ONE HUNDRED PERCENT (100%) of the contract price. The bonds shall be filed within ten (10) calendar days of acceptance of the bidder's proposal by the City. The bonds unless otherwise specified by the Purchasing Manager, shall be 100% of the total contract price. The form of all bonds shall be subject to the approval of the Corporation Counsel of the City. All questions shall be directed to Jason Holy, from V3 Companies, at 630-254-1522 or by email at jholy@v3co.com. The City of Joliet reserves the right to reject any and all bids, parts of any and all bids, or to waive technical errors or omissions in bids. The Contract shall be subject to the provisions of the Prevailing Wage Act (820 ILCS 130/1 et seq.) to the extent required by law. Bid amount A - Steve Spiess construction - 2,055,015 Bid amount B - P T Ferro - 38,392

Award

Water / Sewer

$2,055,015.00

Public - City

Paving, Site Work

38

6

18

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
256
Bidding Soon
3,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

Multiple Locations, Fairmont, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.