Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 14, 2025 at 8:00 PM
Updated March 15, 2025
Site work and paving for a civil project in Fairmont, Illinois. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
The work consists of installation of approximately 72 linear feet of 6-inch ductile iron water main, 2065 liner feet of 8-inch ductile water main, 1102 linear feet of 10- inch ductile iron water main and fire hydrants, valve vaults and new water services. Install approximately 2247 linear feet of 10-inch PVC sanitary mains and new sanitary services. There will also be road resurfacing, pavement patching and landscape. All bidders will be required to submit Bid Security in the form of a Certified Check, Cashier's Check or a Bid Bond in the amount of Ten percent (10%) of the Base Bid, payable to the City of Joliet. Bid Security: 10% Performance Security: 100% For the Fairmont project area, all work, as shown in the Plans, must be substantially complete by Monday, August 18, 2025. Final Completion: September 8, 2025. The Contractor shall not commence work under this contract until he has obtained and submitted both a Performance Bond and a Labor and Material Payment bond to the City and such bonds have been approved by the City. Such bonds shall cover such performance, labor or materials used in the work whether by the Contractor or by any subcontractor. Said bonds shall remain in full force and effect for the duration of the contract and during the term of any guaranty or warranty period required by the Contract Documents. The performance bond shall be conditioned on the full and faithful performance of the contract according to its terms and shall be in an amount of ONE HUNDRED PERCENT (100%) of the contract price. The bonds shall be filed within ten (10) calendar days of acceptance of the bidder's proposal by the City. The bonds unless otherwise specified by the Purchasing Manager, shall be 100% of the total contract price. The form of all bonds shall be subject to the approval of the Corporation Counsel of the City. All questions shall be directed to Jason Holy, from V3 Companies, at 630-254-1522 or by email at jholy@v3co.com. The City of Joliet reserves the right to reject any and all bids, parts of any and all bids, or to waive technical errors or omissions in bids. The Contract shall be subject to the provisions of the Prevailing Wage Act (820 ILCS 130/1 et seq.) to the extent required by law. Bid amount A - Steve Spiess construction - 2,055,015 Bid amount B - P T Ferro - 38,392
Award
Water / Sewer
$2,055,015.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2025
March 20, 2025
Multiple Locations, Fairmont, IL
Related To This Project
Fairmont, IL
--
PY 25 CDBG - Rehabilitation Of The Collinsville Road Manholes And 52nd Street Lift Station - 6058972
Fairmont, IL
Bid Date: Mar 19 2026
Fairmont, IL
Bid Date: Oct 29 2024
Fairmont, IL
Bid Date: Mar 29 2022
Montgomery, IL
Bid Date: Mar 03 2025
Trenton, IL
Bid Date: Feb 11 2025
Chicago, IL
Bid Date: Feb 13 2025
Plainfield, IL
Bid Date: Feb 03 2025
Oak Park, IL
Bid Date: Jan 24 2025
Lake in the Hills, IL
Bid Date: Jan 23 2025
Hanna City, IL
Bid Date: Jan 30 2025
Macomb, IL
Bid Date: Jan 28 2025
Macomb, IL
Bid Date: Jan 28 2025
Monmouth, IL
Bid Date: Jan 28 2025
Edgar, IL
Bid Date: Jan 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
