Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.star-telegram.com/news/state/texas/article299176115.html Construction in San Antonio's downtown area is scheduled to begin Monday, reducing traffic to two lanes for a month. Here's where, and what to know about the incoming project. The Texas Department of Transportation's work is part of the San Antonio Interstate 35 and Interstate 10 downtown repair project. According to a Friday news release, southbound I-35 will be reduced to two lanes from Martin Street to Cesar E. Chavez Blvd. while construction crews complete joint repairs, which are needed to ensure the pavement remains stable amid San Antonio's wide range of weather conditions. Lane closures will remain in place for 24 hours a day until the repairs are completed in about a month. TxDOT expects the work to continue through the end of Feb. 2025, and encourages drivers to "plan ahead for potential delays." ALSO READ: Heeding Trump, Air Force won't teach recruits about Tuskegee Airmen "The I-35 and I-10 downtown repair project includes $25.9 million of improvements to increase safety along 5.5 miles of the corridor on I-35 from S. Laredo St. to I-37/Camden St. and on I-10 from I-35 to Hildebrand Ave," the news release states. "The project is estimated to be completed in Fall 2025." Additionally, the I-35 and I-10 project will address other areas of concern, such as: * Roadway resurfacing * Structure repairs * Bridge joint replacements * Demolition and reconstruction of the I-35 exit ramp to Brooklyn Ave./McCullough Ave ALSO READ: Second grader killed in 'tragic accident' during school drop off ____________________________________________________________________________________________________________________________________________ State Let Construction Contract For Questions Call: Carlos Arcila 4102 Ih 35 South New Braunfels Tx 78130 (830) 609-0707 Length: 5.067 MI Dbe Goal: 0.0% Time for Completion: 172 Working Days Guaranty: 100,000.00 TXDOT - Resurface Roadway - IH 10 Contractor questions on this project are to be addressed to the following individual(s): Carlos Arcila, Carlos.Arcila@txdot.gov Danny Gallegos , Danny.Gallegos@txdot.gov Contractor questions will be accepted through email, phone and in person by the above individuals. Questions may also be submitted via the Letting Pre-Bid Q&A web page. This webpage All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page. A00188135

Award

Roads / Highways

$6,824,351.00

Public - State/Provincial

Paving, Site Work

296

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
46
Bidding Soon
2,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

April 8, 2025

Project location map

I-10, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.