Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 14, 2025 at 8:00 PM
Updated March 15, 2025
Site work and paving for a sidewalk / parking lot in Minneapolis, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Concrete Sidewalks, Curb, Gutter. The work performed under this Contract includes the furnishing of all labor, equipment, tools, and materials necessary to install monolithic concrete sidewalk, ADA compliant pedestrian ramps, curb & gutter, driveway aprons, and concrete alley pavement. In general, the work to be performed for the 2025 construction season is located in the highlighted areas shown on the attached maps (see Attachment A). However, the Contractor shall expect that a significant amount of additional work outside of these areas will be identified. Areas of hazardous and defective sidewalk conditions will be located, measured, and marked in the field by Public Works Sidewalk Inspectors. Public Works shall then provide the Contractor with Work Orders via electronic correspondence identifying the scope of work for each location. The Contractor shall expect that the scope of work will vary for each location, ranging from replacement of individual sidewalk panels to replacement of larger sections of sidewalk, curb & gutter, driveways, concrete alleys, and other related work as directed by the Project Manager or Sidewalk Inspector or its duly authorized representatives. The work may also include the installation of ADA compliant pedestrian ramps meeting the Minnesota Department of Transportation, November 2021 Guidelines for ADA Ped Ramp Installation. The Contractor shall understand that the overall bid quantities are not to be construed as a guarantee of the total amount of work to be performed under this contract, rather the total amount of work shall be as identified by the scope of work in each Work Order. The Contractor shall be able to complete a minimum of 1,500 sidewalk repair locations, with the potential to remove and replace approximately 325,000 square feet of sidewalk under the terms of this contract Event Description Concrete Sidewalks, Curb and Gutter, Alleys and Driveway Approaches Question Deadline 02/11/2025 at 10:00 AM CT For additional information or questions, contact the buyer. All questions must be submitted in writing. Paul Kranz Paul.Kranz@MinneapolisMN.gov Address: Public Service Building Room 300A, 505 4th Ave S. Minneapolis, MN 55415
Bid Results
Sidewalks / Parking Lot
$3,165,025.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
April 28, 2025
Multiple Locations, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Feb 18 2025
Minneapolis, MN
Bid Date: Feb 14 2025
Minneapolis, MN
Bid Date: Feb 18 2025
Minneapolis, MN
Bid Date: Feb 14 2025
Minneapolis, MN
Bid Date: Feb 18 2025
Minneapolis, MN
Bid Date: Jan 29 2025
Minneapolis, MN
Bid Date: Mar 13 2025
Minneapolis, MN
Bid Date: Mar 20 2025
Minneapolis, MN
Bid Date: Feb 03 2025
Minneapolis, MN
Bid Date: Jan 30 2025
Minneapolis, MN
Bid Date: Feb 11 2025
Minneapolis, MN
Bid Date: Feb 04 2025
Minneapolis, MN
Bid Date: Jan 14 2025
Minneapolis, MN
Bid Date: Jan 28 2025
Minneapolis, MN
Bid Date: Feb 06 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed