BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated February 25, 2025

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

The City of Dripping Springs, Texas will accept competitive sealed proposals for construction of the City of Dripping Springs South Regional Wastewater System Howard Ranch Treated Effluent Fill Station. The Project will include installing a 2" CLA-VAL altitude control valve, pipe reducer, and concrete utility vault into existing 2" and 4" treated effluent lines; and the installation of a 2" irrigation meter in a concrete utility vault. The Work to be performed includes furnishing all necessary supervision, machinery, insurance, materials, equipment, tools, and labor necessary for the design, fabrication, material delivery, erection and construction, painting, inspection, and testing to complete the Work. The OWNER reserves the right to waive all informalities and irregularities, and determine which Bids are most advantageous to the Project, and to award the Contract on this basis. Performance, payment, and warranty bonds shall each be issued in an amount equal to 100% of the Contract Amount as security for all the CONTRACTOR's obligations under the Contract Documents. INSURANCE REQUIREMENTS: Bidders shall maintain insurance in the types and amounts indicated the Contract Documents. BID GUARANTY: All Bids must be accompanied by a Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price and in the form of a cashier's check made payable to the City of Dripping Springs, or a Bid Bond issued by a surety. PRE-BID CONFERENCE: No prebid conference will be held. The Work shall be substantially complete no later than 120 calendar days after the date when the Contract Times commence to run as provided in the General Conditions, and completed and ready for final payment in accordance with the General Conditions no later than 150 calendar days after the date when the Contract Times commence to run. Substantially complete shall mean completing the improvements, and testing so that the planned improvements are in operation.

Bid Results

Water / Sewer

$109,152.00

Public - City

Site Work

7

11

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
145
Bidding Soon
2,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.