Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 24, 2025 at 7:00 PM
Updated February 25, 2025
Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.
The City of Dripping Springs, Texas will accept competitive sealed proposals for construction of the City of Dripping Springs South Regional Wastewater System Howard Ranch Treated Effluent Fill Station. The Project will include installing a 2" CLA-VAL altitude control valve, pipe reducer, and concrete utility vault into existing 2" and 4" treated effluent lines; and the installation of a 2" irrigation meter in a concrete utility vault. The Work to be performed includes furnishing all necessary supervision, machinery, insurance, materials, equipment, tools, and labor necessary for the design, fabrication, material delivery, erection and construction, painting, inspection, and testing to complete the Work. The OWNER reserves the right to waive all informalities and irregularities, and determine which Bids are most advantageous to the Project, and to award the Contract on this basis. Performance, payment, and warranty bonds shall each be issued in an amount equal to 100% of the Contract Amount as security for all the CONTRACTOR's obligations under the Contract Documents. INSURANCE REQUIREMENTS: Bidders shall maintain insurance in the types and amounts indicated the Contract Documents. BID GUARANTY: All Bids must be accompanied by a Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price and in the form of a cashier's check made payable to the City of Dripping Springs, or a Bid Bond issued by a surety. PRE-BID CONFERENCE: No prebid conference will be held. The Work shall be substantially complete no later than 120 calendar days after the date when the Contract Times commence to run as provided in the General Conditions, and completed and ready for final payment in accordance with the General Conditions no later than 150 calendar days after the date when the Contract Times commence to run. Substantially complete shall mean completing the improvements, and testing so that the planned improvements are in operation.
Bid Results
Water / Sewer
$109,152.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
April 14, 2025
To Be Determined, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
Bid Date: Jan 21 2025
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jan 30 2025
Austin, TX
--
Austin, TX
Bid Date: Apr 09 2025
Austin, TX
Bid Date: Feb 12 2025
Austin, TX
Bid Date: Feb 18 2025
Austin, TX
Bid Date: Feb 05 2025
Austin, TX
Bid Date: Feb 06 2025
Austin, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
