BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Renovation of a stadium in Fort Worth, Texas. Completed plans call for the renovation of a stadium.

At roof areas, A1, B1, &C1 clean/prep and coat with specified Reinforced Acrylic Fluid Applied Roof System. Apply Silicone topcoat minimum 4' from center of all roof drains or areas of standing water. At existing parapet stone copings, apply manufactures liquid flashing to top and roof side face of coping stone, protect front side of stone coping from runs and drips. At roof areas, E1-3, F1 G2, tear off existing roof assembly down to deck. Patch and repair as needed. Remove all existing metal copings, roof edge gutters, etc. Install new roof system consisting of two layers of 2.2" polyisocyanurate insulation, first layer mechanically attached over steel deck and fully adhered over concrete deck, and second layer fully adhered. Install new fully adhered1/2" cover board. Install new two ply modified bitumen "Cool Roof:" system. Provide all required flashing and pipe penetrations assemblies for new 20-year NDL warranted roof system. Provide new prefinished metal copings, roof edge, gutter, down spouts, and other metal fabrication required for flashing, counterflashing, through wall receivers, and penetrations. All new counterflashing, receivers, and expansion joints to be stainless steel unless visible from the ground. WRMC Coliseum, Burnett and Moncrief Roof Replacement Question Deadline 02/07/2025 at 5:00 PM CT Location : online portal. Proposals shall be valid for ONE HUNDRED TWENTY (120) calendar days. Estimated construction cost is approximately $11,000,000.00. There is one Alternate for this project. Proposals shall include a 7.5% Owner's Contingency Allowance based on Proposer's costs proposal on a separate line item on the Proposal form. This Allowance is not to be included in the Base Proposal but will be included in the contract amount at the appropriate time. Only the Owner may use of this allowance during construction. Any Allowance remaining at the end of construction will be retained by the City of Fort Worth. Refer to the evaluation matrix for the selection of the Best Value Proposer in the Instructions. The Business Equity participation goal is 5.99%. Refer to the Request for Proposal documents for detailed Business Equity compliance information. The applicable documents must be submitted by all Proposers no later than the third City business day after Proposals are opened, exclusive of the opening date. Business Equity information may be submitted with the Proposal. Failure to submit the required business equity documentation will result in the Proposal being considered Non-Responsive. Non-Responsive proposals will not be reviewed further.

Award

Arenas / Stadiums

$11,000,000.00

Public - City

Renovation

17

14

20

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
11
Bidding Soon
2,895
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 14, 2025

Project location map

3401 W Lancaster Ave, Fort Worth, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.