Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Site work and paving for a bridge / tunnel in Stillwater, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of March 28, 2025, the project was awarded to Valley Paving Inc, with an awarded amount of $5,845,582.30.** CSAH 5 Phase 3 for the construction of the county project listed below. Bids must be accompanied by a bid bond or a corporate surety bond made in favor of Washington County in an amount equal to not less than 5% of the total bid. Description: Major Quantities Include: Excavation - Common 6,580 Cu Yd, Type SP 12.5 Non Wear Course Mix (3,B) 2,133 Ton, Type SP 12.5 Wearing Course Mix (3,C) 4,745 Ton, Structural Concrete (1G52) 280 Cu Yd, Structural Concrete (3B52) 260 Cu Yd, Reinforcement Bars (Epoxy Coated) 101,720 Pound, Bridge Slab Concrete (3YHPC-M) 9,259 Sq Ft, Prestressed Concrete Beams 82 MW 970 Lin Ft, Bridge Approach Panels 480 Sq Yd, and Remove Existing Bridge 1 Lump Sum. Washington County hereby notifies all bidders that it does not discriminate on the basis of race, color, national origin, sex, religion, age and handicapped status in employment or the provision of services in consideration for an award. The Board of County Commissioners of Washington County reserves the right to reject any or all bids and waive any defects therein. 25-10511, 2020-03, B2306824, 24-09 All requests for clarifications of this Bidding Package must be in writing and submitted via email to the Engineer. E-Mail all requests for clarifications to Allan Brandt at allan.bradnt@co.washington.mn.us. Put SAP 082-605-017 Clarification Request in the subject line and request receipt acknowledgement. The request for clarification needs to be as specific as possible, indicating the Proposal Section, Plan Sheet or Pay Item in question. Project Location: Along CSAH 5 from Sycamore St. W to Highway 96
Award
Bridges / Tunnels
$5,845,582.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2025
April 28, 2025
Multiple Locations, Stillwater, MN
Related To This Project
Stillwater, MN
Bid Date: Feb 06 2025
Stillwater, MN
Bid Date: Feb 11 2025
Stillwater, MN
--
Stillwater, MN
Bid Date: Mar 04 2025
Stillwater, MN
--
Stillwater, MN
Bid Date: Mar 11 2025
Stillwater, MN
Bid Date: Mar 11 2025
Stillwater, MN
Bid Date: Jun 07 2019
Stillwater, MN
--
Stillwater, MN
Bid Date: Jan 07 2025
Stillwater, MN
Bid Date: Jan 07 2025
Stillwater, MN
Bid Date: Jan 28 2025
Stillwater, MN
Bid Date: Dec 19 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
