Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

**As of July 8th, 2025, this project has not yet been awarded. Additional information will be available following the August 2025 SAWS Board meeting. E Hildebrand Site This project site will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure. What to Expect – E Hildebrand Site Open cut installation of approximately 4,500LF of HDPE or DI water main up to 20-inch in diameter at depths of 5 to 10 ft.. Trenchless installation of approximately 40LF of water main up to 20-inch in diameter at depths up to 10 feet. Installation and tie-ins/shutdowns will require close coordination with the operators of the SAWS Hildebrand Water Supply Tank. Installation and tie-ins/shutdowns will require close coordination with Trinity University and businesses and residents in the project area. Camden & Euclid Sites These project sites will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure. What to Expect – Camden & Euclid Sites Open cut installation of approximately 8,700LF of HDPE or DI water main up to 12-inch in diameter at depths up to 16 feet. Trenchless installation of approximately 160LF of water main up to 12-inch in diameter at depths up to 16 feet. Installation and tie-ins/shutdowns will require close coordination with the Baptist Hospital and other medical service providers in the project area. Installation and tie-ins/shutdowns will require close coordination with businesses and residents in the project area. SAWS Contract Administration Point of Contact: Yvonne Rodriguez, Contract Adminstrator Email: Yvonne.Rodriguez@saws.org 210-233-3105 The estimated construction duration is 15 months and the estimated construction cost is $10.7 million.

GC Bidding

Water / Sewer

$10,700,000.00

Public - City

Site Work

247

3

39

7

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
67
Bidding Soon
2,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.