BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2025 at 7:00 PM

Updated February 11, 2025

Renovation of a mixed-use development in Grandville, Michigan. Completed plans call for the renovation of a educational facility.

**As of February 10, 2025 the bid will awarded to Star Flooring bid amount of $62,000. The start date is June 23. What is the estimated cost of this project 50,000-55,000 Grandville Public Schools is soliciting proposals from qualified contractors/vendors for the sanding and refinishing of its gym floor at Grandville High School. Grandville High School is located at 4700 Canal Ave. SW, Grandville, MI 49418. If you have any questions, please contact Grandville Public Schools Operations Director, Fred Wilks, at (616)254-6247 Or fwilks@gpsbulldogs.org. D. Proposals submitted by facsimile or electronic mail will not be accepted. Late bids will not be considered or accepted. To be eligible for consideration, a proposal must include: a. Bid Form b. Contractor Information Form with references c. Familial Relationship Disclosure Statement d. Iran Linked Business Affidavit E. Although cost is an important factor, the school district is not obligated by any statute or regulation to award the purchase and installation of the floor refinish solely on the basis of cost. Accordingly, the school district reserves the right to evaluate all proposals objectively and subjectively, and to accept or reject any or all proposals or portions thereof. Additionally, the district reserves the right to negotiate changes in services with the firm determined to have submitted the proposal that is in the best interest of the district. F. This RFP constitutes specifications only for the purpose of receiving proposals for services and does not constitute an agreement for those services. It is expected that each bidder will read these specifications with care. Failure to provide requested information or meet certain specified conditions may invalidate the proposal(s). G. Proposals shall remain valid for a period of forty-five (45) days after submission. Modifications to proposals will not be accepted by the district, except as may be mutually agreed upon following the acceptance of the proposal. d. Anticipated Board Award: Monday, February 17, 2025 at 7:00 p.m. local me. e. Project Commencement: Monday, June 23, 2025 Grandville High School's Main Gymnasium floor shall be sanded down to remove existing coatings and painted lines, re-seal gymnasium floor, paint new lines and recoat gym floor. Gymnasium Floor - 17,084 sq . Sealer must only be Hillyard Court Guard Finish Coat must only be Hillyard Diamond 1k Paint shall be MFMA approved paint. Performance Bond in the amount of 5% of the bid amount may be required.

Award

Educational

$62,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
125
Bidding Soon
1,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

June 23, 2025

Project location map

4700 Canal Ave SW, Grandville, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.