Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2025 at 7:00 PM

Updated January 25, 2025

Site work and paving for a mixed-use development in San Antonio, Texas. Design plans call for site work for a 420,800-square-foot road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reconstruction of street and sidewalk with associated drainage and signal work. As of January 24, 2025, the project is in design. A tentative bid schedule for contractors is scheduled for Spring 2025. Construction is slated to begin April 2025, with a substantial completion date in 2027. The firm timeline has not been released.

Design

Roads / Highways

$11,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

Sierra Sunset, San Antonio, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed