Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work for a bridge / tunnel in Tolstoi, Manitoba. Completed plans call for site work for a bridge / tunnel.
Supply and install one (1) precast concrete culvert by trenching (open cut) through Provincial Road 201, approximately 4.9 km east of Provincial Road 209, in the Municipality of Stuartburn. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Date and Liquidated Damages Sub-completion Shall Be Defined as All Work Associated With Installing Precast Concrete Culvert 1500mm, Granular Base Course (Cr-m50, Gbc- M, Gbc-s), Stone Rip Rap Class 350mm, and Erosion Control Blanket. The Work Must Be Completed No Later Than March 31, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Completion Date Shall Be Defined as All Remaining Work (Bituminous Pavement, Seeding, and Erosion Control Blanket). The Work Must Be Completed No Later Than June 30, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charge at Any Given Time Shall Be Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date the Seasonal Shutdown Date for Applicable in-stream Work is April 1-june 15 of Every Calendar Year. The Seasonal Shutdown Date for Applicable Road Work is October 31 of Every Calendar Year. Question Acceptance Deadline: 2025/01/31 12:00:00 PM CST The Work must be Sub-completed no later than March 31, 2025. The Work must be completed no later than June 6, 2025. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Award is subject to final approval
Award
Bridges / Tunnels
$168,350.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
March 4, 2025
MB-209, Tolstoi, MB
Related To This Project
Tolstoi, MB
Bid Date: Nov 04 2025
Cowan, MB
Bid Date: Feb 04 2025
Winnipeg, MB
Bid Date: Mar 14 2025
Winnipeg, MB
Bid Date: Feb 18 2025
Winnipeg, MB
Bid Date: Feb 10 2025
Brandon, MB
Bid Date: Jan 22 2025
Morden, MB
Bid Date: Feb 18 2025
Lac du Bonnet, MB
Bid Date: Feb 21 2025
Winnipeg, MB
Bid Date: Jan 21 2025
Winnipeg, MB
Bid Date: Feb 26 2025
Winnipeg, MB
Bid Date: Feb 26 2025
Winkler, MB
Bid Date: Jan 31 2025
Winnipeg, MB
Bid Date: Jan 31 2025
Winnipeg, MB
Bid Date: Jan 29 2025
Brandon, MB
Bid Date: Jan 31 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
