Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a bridge / tunnel in Tolstoi, Manitoba. Completed plans call for site work for a bridge / tunnel.

Supply and install one (1) precast concrete culvert by trenching (open cut) through Provincial Road 201, approximately 4.9 km east of Provincial Road 209, in the Municipality of Stuartburn. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Date and Liquidated Damages Sub-completion Shall Be Defined as All Work Associated With Installing Precast Concrete Culvert 1500mm, Granular Base Course (Cr-m50, Gbc- M, Gbc-s), Stone Rip Rap Class 350mm, and Erosion Control Blanket. The Work Must Be Completed No Later Than March 31, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Completion Date Shall Be Defined as All Remaining Work (Bituminous Pavement, Seeding, and Erosion Control Blanket). The Work Must Be Completed No Later Than June 30, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charge at Any Given Time Shall Be Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date the Seasonal Shutdown Date for Applicable in-stream Work is April 1-june 15 of Every Calendar Year. The Seasonal Shutdown Date for Applicable Road Work is October 31 of Every Calendar Year. Question Acceptance Deadline: 2025/01/31 12:00:00 PM CST The Work must be Sub-completed no later than March 31, 2025. The Work must be completed no later than June 6, 2025. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Award is subject to final approval

Award

Bridges / Tunnels

$168,350.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
38
Bidding Soon
509
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 4, 2025

Project location map

MB-209, Tolstoi, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.